Report PDFs - all volumes
Mudflat Creek Flood Study
CompletedPublication date: 01/11/2006Mudflat Creek is a 123 hectare catchment which drains to Hardys Bay through the lower Killcare district (refer Figures 1 and 2). The lower section of the catchment is... -
Report PDFs - all volumes
Erina Creek Flood Study Review
CompletedPublication date: 01/03/2012The 32km2 Erina Creek catchment is one of the major tributaries entering Brisbane Water at East Gosford (Figure 1). Figure 2 shows a digital terrain image of the study area and... -
Report PDFs - all volumes
Woy Woy Peninsula Flood Study - Appendix
CompletedPublication date: 01/03/2010Appendix B - Figures -
Report PDFs - all volumes
Davistown Catchment Flood Study
CompletedPublication date: 25/01/2010Volume 1 Report This flood study has been undertaken to determine the flood behaviour in the catchment due to local storm runoff for the 0.5% Annual Exceedance Probability... -
Report PDFs - all volumes
Empire Bay Catchment Flood Study
CompletedPublication date: 25/01/2010Flood modelling of local catchment runoff was completed the Empire Bay catchment for a range of annual exceedance probabilities of storms from 100% AEP to 0.5% AEP and up to a... -
Report PDFs - all volumes
Cockrone Lagoon Flood Study
CompletedPublication date: 01/11/2003This Flood Study comprised the following principal stages: collection and assessment of available data; investigation of coastal processes to determine design ocean levels for... -
Report PDFs - all volumes
Avoca Lagoon Flood Study
CompletedPublication date: 01/11/2003The investigation process used in this flood study was: - collection of available data; - assessment of available data; - overview of lagoon behaviour; - assessment of coastal... -
Report PDFs - all volumes
Wamberal Lagoon Flood Study
CompletedPublication date: 01/11/2001Wamberal Lagoon is a small coastal lagoon within the Gosford City and Wyong Council Local Government areas (Figure 1). The lagoon has a surface area of approximately 0.5 square... -
Report PDFs - all volumes
Cockrone Lagoon Flood Study
CompletedPublication date: 01/06/1999Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the... -
Report PDFs - all volumes
Tuggerah Lakes Flood Study
CompletedPublication date: 01/09/1994The primary objective of the flood study is to provide Council with design flood levels for Tuggerah Lakes. A second objective, to provide a flood forecasting capability, is... -
Report PDFs - all volumes
Review of Lagoon Entrance Modelling for Flood Studies
CompletedPublication date: 01/05/1994Separate Flood studies have been undertaken for four coastal lagoons in the Gosford area, that is, Avoca, Cockrone, Terrigal and Wamberal Lagoons. Different analytical... -
Report PDFs - all volumes
Gosford Coastal Lagoons Flood Studies Comparison of Opening Procedure Avoca...
CompletedPublication date: 01/05/1994Storage Volumes: The modelling showed that the approach developed for Terrigal and Wamberal Lagoons could be satisfactorily applied to Avoca Lagoon for the opening of 14... -
Report PDFs - all volumes
Mardi Creek Flood Study
CompletedPublication date: 01/06/1992Flood Study of Mardi Creek in Wyong Creek catchment