-
Report PDFs - all volumes
TFRMS&P - Final Report
CompletedPublication date: 01/12/2024Temora Flood Risk Management Study and Plan - Final Report -
Dataset handover checklist and description
39 Newbridge Rd Chipping Norton_ver1
CompletedPublication date: 28/11/2024Valuation report, contamination assessment report, property purchase documents, demolition and site remediation documents, site photos (pre and post). -
Hydrological, Hydraulic and flood damage pre-processed model output files
Project data files
CompletedPublication date: 26/11/2024These are the updated model files with the modelling results from the various scenario runs -
Dataset handover checklist and description
ver1
CompletedPublication date: 25/11/2024Valuation report, property purchase documentation, demolition, contamination assessment report -
Hydrological, Hydraulic and flood damage pre-processed model output files
Corowa Howlong and Mulwala_Flood Study_Flood Damages Input and Output Files
CompletedPublication date: 11/10/2024This dataset contains the files used for the flood damages assessment. A spreadsheet is provided for each town (Corowa, Howlong and Mulwala) and for each flood mechanism (Murray... -
Hydrological, Hydraulic and flood damage model input files
Corowa Howlong and Mulwala_Flood Study_Hydrology Input and Outputs
CompletedPublication date: 11/10/2024This dataset consists of the Flood Frequency Analysis undertaken for the Murray River gauges at Doctors Point, Corowa and Yarrawonga, and the Ovens River at Peechelba. The... -
Spatial flood layers (post processed layers - not direct model outputs)
Corowa Howlong and Mulwala_Flood Study_TUFLOW Processed Results
CompletedPublication date: 11/10/2024This dataset contains the processed TUFLOW model outputs. Range of outputs varies from 20% AEP to the PMF. Further details are provided in the Data Handover / Readme file... -
Hydrological, Hydraulic and flood damage pre-processed model output files
Corowa Howlong and Mulwala_Flood Study_TUFLOW Raw Results
CompletedPublication date: 11/10/2024This dataset contains the following TUFLOW folders: check results-raw The results -raw files are limited to the 1% AEP model output files (i.e. exclude the calibration and other... -
Hydrological, Hydraulic and flood damage model input files
Corowa Howlong and Mulwala_Flood Study_TUFLOW Model
CompletedPublication date: 11/10/2024This dataset contains the TUFLOW model files from the following TUFLOW folders: bc-dbase model runs Further details are provided in the Handover Notes / Readme file. The TUFLOW... -
Collected Data
Corowa Howlong and Mulwala_Flood Study_Collected Data
CompletedPublication date: 11/10/2024This dataset contains all the raw data used in the flood study. The data is organised in folders by data and type of data. This includes data such as reports, survey data,... -
Survey Information – all required
Corowa Howlong and Mulwala_Flood Study_GIS Data
CompletedPublication date: 11/10/2024This dataset contains all the GIS layers used or generated by the study, excluding flood result layers. Data includes bathymetry data, LiDAR elevation data, floor level... -
Moorebank Voluntary Acquisition Scheme in Liverpool LGA- Purchase of 47 Rickard Road Chipping NortonDataset handover checklist and description
version_one
CompletedPublication date: 01/10/2024Valuation report, contamination assessment report, property purchase documents, demolition and site remediation documents, site photos (pre and post). -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lower Macleay FRMS TUFLOW results - Historic events
CompletedPublication date: 29/08/2024Lower Macleay FRMS TUFLOW results - Historic events March 2001 and March 2021 -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lower Macleay FRMS TUFLOW results - Design flood events
CompletedPublication date: 29/08/2024Lower Macleay FRMS TUFLOW results - Design flood events. Max envelope grids, flood level contours, velocity vectors for selected events, ts and PO outputs. -
Spatial flood layers (post processed layers - not direct model outputs)
_Lower Macleay FRMS - Delivery - FloodPlanningMappingLayers
CompletedPublication date: 29/08/2024Flood planning area, hydraulic categories (floodway/flood storage/flood fringe), emergency response classification of communities -
Hydrological, Hydraulic and flood damage model input files
Lower Macleay FRMS TUFLOW model input files
CompletedPublication date: 29/08/2024Lower Macleay FRMS TUFLOW model input files. Historic floods, design flood events, sensitivity, mitigation, focussed assessments. -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lower Macleay FRMS TUFLOW results - Focussed assessments
CompletedPublication date: 29/08/2024Lower Macleay FRMS TF - Delivery - Results Processed - Focussed flood assessments for Council. MVRAP, PCYC, Netball Pavilions -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lower Macleay FRMS TUFLOW results - Sensitivity
CompletedPublication date: 29/08/2024Lower Macleay FRMS TUFLOW results - Sensitivity assessments -
All Other Required Data
Lower Macleay FRMS - Flood Damages
CompletedPublication date: 29/08/2024Flood damages calcs for baseline case and mitigation options scenarios. Includes shapefile of building points -
Hydrological, Hydraulic and flood damage model input files
_Lower Macleay FRMS TF - HatHeadLeveeRaising - Memo and Model
CompletedPublication date: 29/08/2024Focussed assessment undertaken for Kempsey Shire Council - flood impact assessment Hat Head levee raising. Model, memo and building database