-
Report PDFs - all volumes
Darlington Point Floodplain Risk Management Study & Draft Plan - Report
CompletedPublication date: 27/10/2021All project report volumes -
Report PDFs - all volumes
Narrandera Floodplain Management - Consequence Management Plan
CompletedPublication date: 25/08/2021The initial aims of the engagement were to investigate the structural integrity of the canal embankment (acting as the town’s levee bank) with a view to determining the best... -
Report PDFs - all volumes
Murrumbidgee Irrigation Canal Levee - Seepage and Stability Analysis
CompletedPublication date: 24/08/2021This report has been prepared by the Dams Section of Infrastructure Services - Public Works Advisory (PWA) and presents the findings of a desktop seepage and stability analysis... -
Report PDFs - all volumes
Narrandera Levee - Levee Structural Integrity Report
CompletedPublication date: 18/09/2020A structural assessment of the southern bank of the Murrumbidgee Irrigation Canal, acting as a levee providing protection to Narrandera has been undertaken. Due to the great age... -
Report PDFs - all volumes
Visual Audit of Narrandera Town Levee
CompletedPublication date: 07/09/2020The audit was carried out during July 2020 as part of the Narrandera Levee – Levee Structural Integrity Assessment engagement by Narrandera Shire Council. This report addresses... -
Report PDFs - all volumes
Snowy Monaro Regional Council Flood and Floodplain Risk Management Studies -...
CompletedPublication date: 01/06/2019Flood Study report covering the four towns -
Report PDFs - all volumes
Murrumbidgee River at Darlington Point and Environs Flood Study - Report
CompletedPublication date: 12/12/2018Report and Mapping Compendium -
Report PDFs - all volumes
Review of the Narrandera Floodplain Risk Management Study and Plan - Report
CompletedPublication date: 01/10/2018Report and Figures. Addendum from 18 July 2023 was added to this dataset 4/4/2024. The addendum provides an update on the implementation of measures set out in the main report... -
Dataset handover checklist and description
Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and...
CompletedPublication date: 13/04/2018Dataset Handover Description -
Report PDFs - all volumes
Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and...
CompletedPublication date: 13/04/2018Volume 1: Report Volume 2: Figures and Appendices -
Report PDFs - all volumes
Gundagai Flood Study - Report
CompletedPublication date: 02/03/2018Complete report - data associated with this is part of the Gundagai FRMS&P -
Report PDFs - all volumes
Wagga Wagga Levee Upgrade Detailed Design Report - Report
CompletedPublication date: 03/12/2015Complete report -
Report PDFs - all volumes
Narrandera Flood Study Review and Levee Options Assessment - Report
CompletedPublication date: 01/10/2015Volume 1 and Volume 2 -
Report PDFs - all volumes
Hay to Maude - TUFLOW Model Validation for March 2012 Event - Report
CompletedPublication date: 08/08/2013Memorandum -
Report PDFs - all volumes
Jeralgambeth Creek at Illabo - FRMSP - Report
CompletedPublication date: 01/03/2012Complete report -
Report PDFs - all volumes
Murrumbidgee River - Flood Modelling 2012 - Report
CompletedPublication date: 31/01/2012Report, Figures and Appendix -
Dataset handover checklist and description
Murrumbidgee River Flood Modelling - Report
CompletedPublication date: 26/09/2011Complete -
Report PDFs - all volumes
Review of water management during the 2010 flood events in the Tumut River...
CompletedPublication date: 01/08/2011Complete Report -
Report PDFs - all volumes
Oura to Braehour Design Flood Event Mapping - Report
CompletedPublication date: 07/01/2011Complete Report -
Report PDFs - all volumes
Conargo Floodplain Risk Management Study & Plan - Report
CompletedPublication date: 01/07/2010Complete report