-
Report PDFs - all volumes
Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 14/06/2024Revised flood study and floodplain risk management Study and plan. -
Report PDFs - all volumes
Towradgi Creek Flood Study, Floodplain Risk Management Study and Plan - Final Reports
CompletedPublication date: 26/06/2023Final Flood Study, Floodplain Risk Management Study and Plan reports adopted by Wollongong City Council on 26 June 2023. -
All Other Required Data
Mullet Creek - Flood Model User Guide and Data
CompletedPublication date: 05/04/2023The Flood Model User Guideline for Mullet Creek has been developed to accompany the handover of the 2023 Mullet Creek Floodplain Risk Management Study and Plan (FPRMSP)... -
Report PDFs - all volumes
Investigation and Concept Design of Ursula Road Scheme, Bulli - Reports
CompletedPublication date: 19/12/2022Includes PDF and Word versions of the final report -
Report PDFs - all volumes
Concept Design Report - Bellambi Gully Channel Improvement Works Between the...
CompletedPublication date: 07/12/2020Concept design report for the Bellambi Gully Scheme -
Dataset handover checklist and description
Detailed Design Report - West Street Swale - Report
CompletedPublication date: 07/12/2020Detailed Design Report -
Report PDFs - all volumes
Allans Creek Flood Study - Report and Mapping
CompletedPublication date: 11/12/2019PDF Copies of final report and flood mapping. -
Report PDFs - all volumes
HEWITTS CREEK FLOOD STUDY 2019 - Volume 1 & 2
CompletedPublication date: 01/12/2019HEWITTS CREEK FLOOD STUDY 2019 - Volume 1 & 2 -
Report PDFs - all volumes
Minnegang Creek Flood Study - Report
CompletedPublication date: 23/10/2019Volume 1: Report Volume 2: Maps -
Report PDFs - all volumes
Kully Bay Overland Flow Study - Report
CompletedPublication date: 23/10/2019Volume 1: Report Volume 2: Maps -
Report PDFs - all volumes
Collins Creek Flood Study - Report and Figures
CompletedPublication date: 27/09/2019PDF Copies of final report and figures -
Report PDFs - all volumes
Wollongong City Flood Study (2019) - Report
CompletedPublication date: 19/08/2019Final report of the flood study -
Report PDFs - all volumes
Review of the Brooks Creek Flood Study
CompletedPublication date: 30/04/2018Final Flood Study and appendices. -
Report PDFs - all volumes
Mullet Creek Flood Model Update Report
CompletedPublication date: 13/04/2018Final Flood Report -
Dataset handover checklist and description
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017Complete report -
Report PDFs - all volumes
Lowering of Gurungaty Causeway Concept Design Report- Report
CompletedPublication date: 02/08/2017Complete report -
Report PDFs - all volumes
Debris Control Screens - Report
CompletedPublication date: 22/06/2017Complete report -
Report PDFs - all volumes
Wollongong City (Gurungaty Waterway) Catchment Floodplain Risk Management...
CompletedPublication date: 01/11/2015Volume 1 - Main Report, Volume 2 - Figures, Volume 2 - Appendix B and maps -
Report PDFs - all volumes
Railway Culvert Upgrade at Tramway Creek - Report
CompletedPublication date: 25/07/2014Report and appendices -
Report PDFs - all volumes
Tramway Creek Culvert Upgrade - Report
CompletedPublication date: 01/07/2014Detailed Design Report (Rev C)