-
Report PDFs - all volumes
Boggabri Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 01/03/2024Final report -
Spatial flood layers (post processed layers - not direct model outputs)
Lismore February 2022 Flood Results
CompletedPublication date: 23/02/2024Max grids, XMDF, POs -
Spatial flood layers (post processed layers - not direct model outputs)
Throsby, Styx and Cottage Creek Flood Study post-processed results
CompletedPublication date: 01/12/2023TUFLOW model post-processed results: - peak flood depth - peak flood velocity - peak flood elevation - peak flood Hazard (H1-H6) - flood function - flood planning area - flood... -
Report PDFs - all volumes
Northern LGA Flood Study - Report
CompletedPublication date: 01/11/2023Northern LGA Flood Study -
Hydrological, Hydraulic and flood damage pre-processed model output files
NLGA Flood Study Results
CompletedPublication date: 01/11/2023Flood study result files, including post processed FERC maps, depth, level and hazard and extent shapefiles -
Report PDFs - all volumes
Woy Woy FRMSP - Final Reports
CompletedPublication date: 15/08/2023Main Volume FRMS, technical volume FRMS, FRMP and Appendices -
Report PDFs - all volumes
Lithgow Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 01/08/2023Lithgow Floodplain Risk Management Study and Plan - Reports -
Report PDFs - all volumes
Cooks River Catchment Flood Study Stage 1 - report
CompletedPublication date: 10/05/2023The Cooks River catchment is a major watershed within Sydney, draining some 103 km2 and is home to 560,265 people (ABS, 2020). As such, Cooks River is a key catchment in terms... -
Emergency Response Planning
Mullet Creek Floodplain Risk Management Study and Plan - Post processed and...
CompletedPublication date: 05/04/2023Processed results, planning layers, and emergency response layers -
Hydrological, Hydraulic and flood damage pre-processed model output files
Mullet Creek Floodplain Risk Management Study and Plan - TUFLOW Raw Outputs
CompletedPublication date: 05/04/2023TUFLOW Outputs and WaterRide and xmdf data for design events -
Hydrological, Hydraulic and flood damage model input files
Mullet Creek Floodplain Risk Management Study and Plan - Model Inputs
CompletedPublication date: 05/04/2023Model files for running the WBNM and TUFLOW models -
Report PDFs - all volumes
Mullet Creek Floodplain Risk Management Study and Plan - Final Reports
CompletedPublication date: 05/04/2023Final reports -
Dataset handover checklist and description
Mullet Creek Floodplain Risk Management Study and Plan - Mullet Creek...
CompletedPublication date: 05/04/2023Read me -
Hydrological, Hydraulic and flood damage pre-processed model output files
Mullet Creek Floodplain Risk Management Study and Plan - WBNM Raw Outputs
CompletedPublication date: 05/04/2023WBNM Raw Outputs -
Dataset handover checklist and description
Bimbi Flood Study Final Report Volume 2
CompletedPublication date: 16/03/2023Bimbi is located in the Central West NSW with a population of 114 people, according to the 2016 Australian Bureau of Statistics Census. It predominately consists of rural... -
Spatial flood layers (post processed layers - not direct model outputs)
Design Flood Extents
CompletedPublication date: 10/03/2023Flood extent polygons in SHP and Tab file format -
Report PDFs - all volumes
Wyalong and West Wyalong Flood Study - Final Report
CompletedPublication date: 02/02/2023Wyalong and West Wyalong Flood Study - Final Flood Study Report -
Report PDFs - all volumes
Bourke Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 01/12/2022Bourke Floodplain Risk Management Study and Plan Final Report -
Dataset handover checklist and description
North Sydney LGA wide Floodplain Risk Management Study and Plan - Handover...
CompletedPublication date: 28/11/2022Handover Checklist -
Management options
Goulburn Floodplain Risk Management Study and Plan - Management Options...
CompletedPublication date: 06/07/2022Damages spreadsheets used for assessing management options