-
Hydrological, Hydraulic and flood damage model input files
3_FCT FRMS - TUFLOW Hydraulic Model Inputs
CompletedPublication date: 12/08/2024TUFLOW control and input files for all FRMS simulations, check files included for one event. See "READ ME_FCT FRMS_all runs log.xlsx". 'Read me' tab describes .tcf files, 'log'... -
Dataset handover checklist and description
SES Data Portal Contents
CompletedPublication date: 12/08/2024Description of all data uploaded to SES Data Portal including an overview and full list of files. -
Report PDFs - all volumes
Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 14/06/2024Revised flood study and floodplain risk management Study and plan. -
All Other Required Data
Mullet Creek - Flood Model User Guide and Data
CompletedPublication date: 05/04/2023The Flood Model User Guideline for Mullet Creek has been developed to accompany the handover of the 2023 Mullet Creek Floodplain Risk Management Study and Plan (FPRMSP)... -
Dataset handover checklist and description
Final Port Stephens Foreshore (Floodplain) Risk Management Study and Plan...
CompletedPublication date: 31/07/2021Data contains readme file -
All Other Required Data
Batemans Bay Urban Creeks Flood Study - Read Me
CompletedPublication date: 01/07/2021Handover summary -
Community Consultation
Mudgee Flood Study - Community Newsletter
CompletedPublication date: 22/02/2021This is the news letter that was distributed to the community. A questionnaire was also completed. The results from that questionnaire is part of this data set -
All Other Required Data
Merimbula Lake and Back Lake FRMSP - Read me
CompletedPublication date: 17/02/2021Handover spreadsheet -
Dataset handover checklist and description
MBBBFS_Data_Checklist
CompletedPublication date: 01/08/2020Murrumbateman, Bowning, Bookham and Binalong Flood Study - Data Handover Checklist -
Dataset handover checklist and description
Eden, Twofold Bay, Towamba River Flood Study - Read Me
CompletedPublication date: 29/04/2020Summary -
Report PDFs - all volumes
Griffith_Aerodrome Overland Flow Flood Study
CompletedPublication date: 05/02/2010INTRODUCTION In recent years, small duration heavy intensity rainfall events associated with thunder storms have shown that the Griffith Aerodrome and associated infrastructure... -
Dataset handover checklist and description
Macleay River at Kempsey - Geomorphologic Assessment - File Locations
CompletedPublication date: 01/03/2008Summary