Report PDFs - all volumes
Cockrone Lagoon Flood Study
CompletedPublication date: 01/11/2003This Flood Study comprised the following principal stages: collection and assessment of available data; investigation of coastal processes to determine design ocean levels for... -
Report PDFs - all volumes
Wamberal Lagoon Flood Study
CompletedPublication date: 01/11/2001Wamberal Lagoon is a small coastal lagoon within the Gosford City and Wyong Council Local Government areas (Figure 1). The lagoon has a surface area of approximately 0.5 square... -
Report PDFs - all volumes
Cockrone Lagoon Flood Study
CompletedPublication date: 01/06/1999Flood study centres around the opening of Cockrone Lagoon to the ocean when the water level exceeds the let-out-level of RL2.476m AHD. The policy is aimed at minimising the... -
Report PDFs - all volumes
Scone - Floodplain Management Study & Plan
CompletedPublication date: 01/05/1999Within Chapter 2, the characteristics of the study's catchments are described. This includes land use, social profile, heritage and vegetation issues. A list of authorities and... -
Report PDFs - all volumes
Tuggerah Lakes Flood Study
CompletedPublication date: 01/09/1994The primary objective of the flood study is to provide Council with design flood levels for Tuggerah Lakes. A second objective, to provide a flood forecasting capability, is... -
Report PDFs - all volumes
Report on Gosford Lagoon Openings June-July 1994
CompletedPublication date: 01/09/1994Lagoon Opening data: Wamberal Lagoon and Avoca lake openings Automatic recorder levels Comparison of Wamberal lagoon openings Comparison of Terrigal lagoon openings Comparison... -
Report PDFs - all volumes
Gosford Coastal Lagoons Compendium of Data
CompletedPublication date: 01/07/1994Compendium of Data to studies conducted on Gosford Coastal Lagoons -
Report PDFs - all volumes
Gosford Coastal Lagoons Flood Studies Comparison of Opening Procedure Avoca...
CompletedPublication date: 01/05/1994Storage Volumes: The modelling showed that the approach developed for Terrigal and Wamberal Lagoons could be satisfactorily applied to Avoca Lagoon for the opening of 14... -
Report PDFs - all volumes
Review of Lagoon Entrance Modelling for Flood Studies
CompletedPublication date: 01/05/1994Separate Flood studies have been undertaken for four coastal lagoons in the Gosford area, that is, Avoca, Cockrone, Terrigal and Wamberal Lagoons. Different analytical... -
Report PDFs - all volumes
Green Point Creek, Pearl Beach Floodplain Management Study
CompletedPublication date: 01/11/1992The Green Point Creek system has been divided into component areas for application of a floodplain management plan. The component areas, illustrated on Figure 13, cover:... -
Report PDFs - all volumes
Mardi Creek Flood Study
CompletedPublication date: 01/06/1992Flood Study of Mardi Creek in Wyong Creek catchment -
Report PDFs - all volumes
Greystanes Creek and Pendle Hill Creek Flood Mitigation Study
CompletedPublication date: 01/12/1985Flood mitigation measures were investigated for eliminating flood problems for the 1% annual exceedance probability flood for: Greystanes Creek from Fox Hills Golf Course to...