-
Report PDFs - all volumes
1_FCT FRMS&P - Final Reports and Mapping
CompletedPublication date: 12/08/2024PDF Copies of Volume 1 FRMS&P Report, Volume 2 Flood Study Update, and Volume 3 Flood Mapping Compendium. -
Report PDFs - all volumes
Prospect Creek FRMSP Report
CompletedPublication date: 11/07/2024The Study Area The study area comprises four sub-catchments within the Canterbury-Bankstown Council Local Government Area (LGA) that drain to Prospect Creek: Georges Hall Sub-... -
Report PDFs - all volumes
South Albury Levee Update - Murray River Flood Study Reports
CompletedPublication date: 24/06/2024Final report and Appendix B (Flood Mapping) -
Spatial flood layers (post processed layers - not direct model outputs)
South Albury Levee Upgrade - Murray River Flood Study Spatial Layers
CompletedPublication date: 24/06/2024Processed flood modelling outputs - including flood extents, flood planning area and hydraulic categorisation (i.e. floodway, flood storage, flood fringe) -
Report PDFs - all volumes
2024 Hawkesbury-Nepean River Flood Study reports
CompletedPublication date: 20/06/2024Flood Study Overview, Flood Study Report, 12 technical volumes, 4 map book volumes, Engagement Outcomes Report -
Report PDFs - all volumes
Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 14/06/2024Revised flood study and floodplain risk management Study and plan. -
All Other Required Data
Options Analysis
CompletedPublication date: 14/06/2024Damages and Options Assessment -
Hydrological, Hydraulic and flood damage pre-processed model output files
Raw TUFLOW Results
CompletedPublication date: 14/06/2024Raw Results -
Hydrological, Hydraulic and flood damage pre-processed model output files
Hydrology
CompletedPublication date: 14/06/2024WBNM -
Hydrological, Hydraulic and flood damage model input files
TUFLOW Model
CompletedPublication date: 14/06/2024Tuflow Model -
Spatial flood layers (post processed layers - not direct model outputs)
Model Outputs
CompletedPublication date: 14/06/2024Raster and Vector Output Data -
Dataset handover checklist and description
Richmond and Wilsons Rivers flood warning improvement Recommendations Report
CompletedPublication date: 28/05/2024This document summarises a literature review and gap analysis of the existing flood warning network to identify recommendations related to the improvement of flood warning... -
Report PDFs - all volumes
Flood Mitigation options for North Wagga - Evaluation of options
CompletedPublication date: 08/05/2024An analysis of hr flood mitigation options for North Wagga and the recommendation of a preferred option. -
Report PDFs - all volumes
Bonalbo Floodplain Risk Management Plan
CompletedPublication date: 23/04/2024The Bonalbo Floodplain Risk Management Plan (FRMP) has been prepared for Kyogle Council in accordance with the NSW Flood Prone Land Policy and the principles of the Floodplain... -
Report PDFs - all volumes
Post Event Flood Behaviour Analysis of the March 2022 Event - Belongil Creek Report
CompletedPublication date: 19/04/2024This report was commissioned by DPE (now DCCEEW) to collate information and assess the impacts of the February/March 2022 floods. -
Dataset handover checklist and description
Post Event Flood Behaviour Analysis of the March 2022 Event - Tallow Creek Report
CompletedPublication date: 19/04/2024This report was commissioned by DPE (now DCCEEW) to collate information and assess the impacts of the February/March 2022 floods. -
Report PDFs - all volumes
Post 2022 Event Flood Behaviour Analysis – Tweed/Byron Coastal Creeks Report
CompletedPublication date: 01/04/2024This report was commissioned by DCCEEW to collate information and assess the impacts of the February/March 2022 floods. -
Report PDFs - all volumes
Wooli Floodplain Risk Management Study and Plan as adopted
CompletedPublication date: 26/03/2024Document as adopted by Council resolution 07.23.180 (draft watermark has not been removed) -
Plans for works
Barellan Levee Construction Plans
CompletedPublication date: 14/03/2024Construction Plans for the Barellan Levee based in Option D in the Barellan Levee Options Feasibility Study (WMS February 2021) -
Report PDFs - all volumes
Boggabri Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 01/03/2024Final report