-
Report PDFs - all volumes
Report
CompletedPublication date: 15/09/2025Final report which includes Volume 1 (report text and appendices) and Volume 2 (figures) Adopted by Wollongong City Council on 15 September 2025 -
Community Consultation
Consultation Documents
CompletedPublication date: 15/09/2025Contains all documentation that was distributed to the community as part of the public exhibition of the draft report -
Land use planning
Land Use Planning
CompletedPublication date: 15/09/2025Include Flood Planning Level grid, flood planning constraint categories and flood risk precinct GIS layers -
Hydrological, Hydraulic and flood damage pre-processed model output files
XP-RAFTS Hydrologic Model
CompletedPublication date: 15/09/2025Contains XP-RAFTS Model inputs and outputs for ARR1987, ARR2019 and PMP -
Hydrological, Hydraulic and flood damage pre-processed model output files
TUFLOW Results
CompletedPublication date: 15/09/2025Contains raw TUFLOW model results for base case and mitigation options -
Hydrological, Hydraulic and flood damage model input files
TUFLOW Inputs
CompletedPublication date: 15/09/2025Contains all TUFLOW model inputs along with a read me file explaining how to run the model -
Emergency Response Planning
Flood Emergency Response Planning
CompletedPublication date: 15/09/2025Flood emergency response precinct and road overtopping GIS layers -
Spatial flood layers (post processed layers - not direct model outputs)
Hydraulic Model Outputs
CompletedPublication date: 06/05/2025Contains post-processed (filtered) TUFLOW results grids. This includes depths, levels, velocity, hazard and hydraulic categories. Afflux grids are also provided for sensitivity... -
Report PDFs - all volumes
1_FCT FRMS&P - Final Reports and Mapping
CompletedPublication date: 12/08/2024PDF Copies of Volume 1 FRMS&P Report, Volume 2 Flood Study Update, and Volume 3 Flood Mapping Compendium. -
Hydraulic modelling post processed files for AVIs
5_FCT FRMS - TUFLOW Processed Outputs
CompletedPublication date: 12/08/2024Peak enveloped & filtered level, depth, velocity and hazard results. See "240814_FCT FRMS_SES Data Portal Contents.xlsx" for full description. -
Hydrological, Hydraulic and flood damage pre-processed model output files
4_FCT FRMS - TUFLOW RAW Outputs
CompletedPublication date: 12/08/2024FCT_ARR19 - ARR2019 Raw results for 20%, 10%, 5%, 2%, 1%, 1 in 200 and 1 in 500 AEP events, 2x durations, 2x blockages FCT_PMF_ARR87 - Raw results for PMF and ARR1987 based 20%... -
Hydrological, Hydraulic and flood damage model input files
3_FCT FRMS - TUFLOW Hydraulic Model Inputs
CompletedPublication date: 12/08/2024TUFLOW control and input files for all FRMS simulations, check files included for one event. See "READ ME_FCT FRMS_all runs log.xlsx". 'Read me' tab describes .tcf files, 'log'... -
Spatial flood layers (post processed layers - not direct model outputs)
6_FCT FRMS - Flood Planning Layers
CompletedPublication date: 12/08/2024FPA - Flood Planning Areas based on the DFE (minor overland, major overland, mainstream) and Flood Planning Level FPCCs - Example Flood Planning Constraint Categories FRPs -... -
Hydrological, Hydraulic and flood damage model input files
2_FCT FRMS - Hydrologic Model
CompletedPublication date: 12/08/2024WBNM hydrologic model inputs and results. See "240814_FCT FRMS_SES Data Portal Contents.xlsx" for full description. -
Dataset handover checklist and description
SES Data Portal Contents
CompletedPublication date: 12/08/2024Description of all data uploaded to SES Data Portal including an overview and full list of files. -
Hydrological, Hydraulic and flood damage model input files
TUFLOW Model
CompletedPublication date: 14/06/2024Tuflow Model -
Report PDFs - all volumes
Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 14/06/2024Revised flood study and floodplain risk management Study and plan. -
Hydrological, Hydraulic and flood damage pre-processed model output files
Raw TUFLOW Results
CompletedPublication date: 14/06/2024Raw Results -
Hydrological, Hydraulic and flood damage pre-processed model output files
Hydrology
CompletedPublication date: 14/06/2024WBNM -
All Other Required Data
Options Analysis
CompletedPublication date: 14/06/2024Damages and Options Assessment