-
Report PDFs - all volumes
Currarong Creek Flood Study - Report (Final)
CompletedPublication date: 20/09/2021Currarong Creek flood study report -
Report PDFs - all volumes
Jewells Wetland Flood Study
CompletedPublication date: 01/08/2013Final Report PDF -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lake Macquarie Waterway flood study 2012 Hydrology Hydraulics data folder
CompletedPublication date: 01/06/2012Shapefiles, TUFLOW hydraulic model and WBNM hydrological model for Lake Macquarie Waterway Flood study 2012. Prepared by WMA Water. Design flood approach includes adopted... -
Report PDFs - all volumes
Lake Macquarie Waterway - Flood Study 2012
CompletedPublication date: 01/06/2012The key objective of this Flood Study is to develop a suitable hydrologic/hydraulic model that can project flood and permanent inundation water levels in Lake Macquarie from... -
Report PDFs - all volumes
South Creek Flood Study
CompletedPublication date: 01/08/2010Flood Study August 2010 -
Community Consultation
Tweed Byron Coastal Creek FS Resident Survey
CompletedPublication date: 01/03/2010Includes letters to residents, flood marks, notes and resident photos -
Hydrological, Hydraulic and flood damage model input files
Tweed Byron Coastal Creeks Hydrology Files
CompletedPublication date: 01/03/2010XP RAFTS files -
Hydrological, Hydraulic and flood damage model input files
Tweed Byron Coastal Creeks Hydraulics Files
CompletedPublication date: 01/03/2010TUFLOW model and result files for design runs - 5% to PMF and climate change TUFLOW results files for calibration runs -
Survey Information – all required
Tweed Byron Coastal Creeks Flood Study Survey Data
CompletedPublication date: 01/03/2010This includes the final model DEM, Culvert survey, North Ocean Shores bund survey, Hydrographic data, ALS data, Cudgera Creek Top of Bank and Kingsland data, cadastre data -
Report PDFs - all volumes
Tweed Byron Coastal Creeks Flood Study Reports
CompletedPublication date: 01/03/2010Includes: Main Flood Study Report and Addendum Climate Change Assessment Report and Kallaroo Circuit Culverts Assessment -
Report PDFs - all volumes
Review and Assessment of Hydrologic/Hydraulic Flood Models - Report
CompletedPublication date: 01/12/2006Complete Report -
Report PDFs - all volumes
Mudflat Creek Flood Study
CompletedPublication date: 01/11/2006Mudflat Creek is a 123 hectare catchment which drains to Hardys Bay through the lower Killcare district (refer Figures 1 and 2). The lower section of the catchment is... -
Report PDFs - all volumes
Stony Creek Flood Study
CompletedPublication date: 01/12/2005The objectives of the Flood Study are to: • Identify all the flood-related data by searching all relevant data sources. • Determine the likely extent and nature of flooding and... -
Report PDFs - all volumes
North Creek Flood Study
CompletedPublication date: 01/05/2005In view of the increasing catchment development and the need to accurately define the flood problem, Lake Macquarie City Council engaged Webb, McKeown & Associates, to... -
All Other Required Data
Flood Study Report Wellington - Other Data
CompletedPublication date: 01/06/1995Other Data -
All Other Required Data
Flood Study Report Wellington - Figures (.XLC)
CompletedPublication date: 01/06/1995Figures (.XLC) -
Hydrological, Hydraulic and flood damage model input files
Flood Study Report Wellington - Hydraulic Model (MIKE-11)
CompletedPublication date: 01/06/1995Hydraulic Model (MIKE-11) - Inputs and Outputs -
Report PDFs - all volumes
Flood Study Report Wellington
CompletedPublication date: 01/06/1995This flood study identifies the nature and extent of the flooding problem in Wellington. Estimates of design discharges, velocities and levels for the 5%, 2% 1% and 0.002% AEP... -
Report PDFs - all volumes
Development of a Hydrologic Data Base for the Illawarra Region - Paper
CompletedPublication date: 01/01/1111Complete Paper -
Report PDFs - all volumes
Geurie Flood Study
SupersededPublication date: 16/10/2006Overview In order to properly plan and manage both existing and future development within the floodplain, there is a need for Council to establish appropriate flood planning...