-
Report PDFs - all volumes
Tarcutta, Ladysmith and Uranquinty Floodplain Risk Management Studies and...
CompletedPublication date: 18/06/2021The final report and the three appendices covering each village in particular, The creeks that are part of this study are Tarcutta Creek, Kyeamba Creek and Sandy Creek. -
Report PDFs - all volumes
Wagga Wagga MOFFS Reports
CompletedPublication date: 03/05/2021The report in volume 1 and the figures and Appendices are in volume 2 -
Base information on buildings
Spreadsheet and GIS data for floor levels and overfloor flooding
CompletedPublication date: 03/05/2021Spreadsheet and GIS data for floor levels and overfloor flooding based on the four catchments in the study -
Hydrological, Hydraulic and flood damage pre-processed model output files
Tuflow Models for the four catchments
CompletedPublication date: 03/05/2021Tuflow models for the four catchments, including base, models and runs -
Spatial flood layers (post processed layers - not direct model outputs)
Wagga Moffs Spatial Data
CompletedPublication date: 03/05/2021The GIS data for the Wagga MOFFS project -
Report PDFs - all volumes
Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and...
CompletedPublication date: 13/04/2018Volume 1: Report Volume 2: Figures and Appendices -
Report PDFs - all volumes
Narrandera Flood Study Review and Levee Options Assessment - Report
CompletedPublication date: 01/10/2015Volume 1 and Volume 2 -
Report PDFs - all volumes
Murrumbidgee River - Flood Modelling 2012 - Report
CompletedPublication date: 31/01/2012Report, Figures and Appendix -
Dataset handover checklist and description
Murrumbidgee River Flood Modelling - Report
CompletedPublication date: 26/09/2011Complete -
Report PDFs - all volumes
Review of water management during the 2010 flood events in the Tumut River...
CompletedPublication date: 01/08/2011Complete Report -
Report PDFs - all volumes
Oura to Braehour Design Flood Event Mapping - Report
CompletedPublication date: 07/01/2011Complete Report -
Report PDFs - all volumes
Wagga Wagga - Levee Gradient Sensitivity Assessment - Report
CompletedPublication date: 06/01/2006Report and Figures -
Report PDFs - all volumes
Murrumbidgee River - Flood Mitigation Study - Report
CompletedPublication date: 01/11/1977Complete report -
Report PDFs - all volumes
Lower Burkes Creek - Flood Mitigation Scheme - Report
CompletedPublication date: 01/01/1111Complete Report