-
Report PDFs - all volumes
Brisbane Water Foreshore Floodplain Risk Management Plan - Report Appendices
CompletedPublication date: 30/11/2015A B C D -
Report PDFs - all volumes
Brisbane Water Foreshore Floodplain Risk Management Plan - Report
CompletedPublication date: 30/11/2015PDF -
Report PDFs - all volumes
Gosford CBD - Local Overland Flow Flood Study - Report
CompletedPublication date: 10/08/2012Gosford CBD - Local Overland Flow Flood Study - Report -
Report PDFs - all volumes
Mudflat Creek Floodplain Risk Management Plan
CompletedPublication date: 12/08/2008The Mudflat Creek catchment is characterised by a distinct upper and lower section. The upper section of the catchment is located in the plateau area of Killcare Heights. This... -
Dataset handover checklist and description
Mudflat Creek Floodplain Risk Management Study
CompletedPublication date: 12/08/2008The Mudflat Creek catchment is characterised by a distinct upper and lower section (refer Figure 1). The upper section of the catchment is located in the plateau area of... -
Report PDFs - all volumes
Mudflat Creek Flood Study
CompletedPublication date: 01/11/2006Mudflat Creek is a 123 hectare catchment which drains to Hardys Bay through the lower Killcare district (refer Figures 1 and 2). The lower section of the catchment is... -
Report PDFs - all volumes
Terrigal Lagoon Floodplain Management Study - Report
CompletedPublication date: 29/11/2001Complete report -
Report PDFs - all volumes
Terrigal Lagoon Floodplain Management Plan - Report
CompletedPublication date: 29/11/2001Complete report -
Report PDFs - all volumes
Terrigal Lagoon Flood Study - Report
CompletedPublication date: 29/11/2001Complete report -
Report PDFs - all volumes
Kariong Area Drainage Investigation - Report
CompletedPublication date: 01/10/2001Report and Appendices (A & B) -
Report PDFs - all volumes
Hawkesbury-Nepean Floodplain Management Strategy - Analysis of Community...
CompletedPublication date: 01/08/2001Volume 1 and Volume 2 -
Report PDFs - all volumes
Hawkesbury Nepean Floodplain Management Strategy - Road Evacuation Route...
CompletedPublication date: 01/07/2000Complete report -
Report PDFs - all volumes
Bensville - Urban Investigation Area - Truck Drainage Strategy Study Report
CompletedPublication date: 01/06/1999Complete -
Report PDFs - all volumes
Flood and Drainage Strategy Plan - Brisbane Water - Map
CompletedPublication date: 11/11/1111Flood and Drainage Strategy Plan - Brisbane Water - Map -
Report PDFs - all volumes
Gosford Coastal Lagoons Compendium of Data
CompletedPublication date: 01/07/1994Compendium of Data to studies conducted on Gosford Coastal Lagoons -
Report PDFs - all volumes
Review of Lagoon Entrance Modelling for Flood Studies
CompletedPublication date: 01/05/1994Separate Flood studies have been undertaken for four coastal lagoons in the Gosford area, that is, Avoca, Cockrone, Terrigal and Wamberal Lagoons. Different analytical... -
Report PDFs - all volumes
Gosford Coastal Lagoons Flood Studies Comparison of Opening Procedure Avoca...
CompletedPublication date: 01/05/1994Storage Volumes: The modelling showed that the approach developed for Terrigal and Wamberal Lagoons could be satisfactorily applied to Avoca Lagoon for the opening of 14...