-
Report PDFs - all volumes
1_FCT FRMS&P - Final Reports and Mapping
CompletedPublication date: 12/08/2024PDF Copies of Volume 1 FRMS&P Report, Volume 2 Flood Study Update, and Volume 3 Flood Mapping Compendium. -
Hydraulic modelling post processed files for AVIs
5_FCT FRMS - TUFLOW Processed Outputs
CompletedPublication date: 12/08/2024Peak enveloped & filtered level, depth, velocity and hazard results. See "240814_FCT FRMS_SES Data Portal Contents.xlsx" for full description. -
Hydrological, Hydraulic and flood damage pre-processed model output files
4_FCT FRMS - TUFLOW RAW Outputs
CompletedPublication date: 12/08/2024FCT_ARR19 - ARR2019 Raw results for 20%, 10%, 5%, 2%, 1%, 1 in 200 and 1 in 500 AEP events, 2x durations, 2x blockages FCT_PMF_ARR87 - Raw results for PMF and ARR1987 based 20%... -
Hydrological, Hydraulic and flood damage model input files
3_FCT FRMS - TUFLOW Hydraulic Model Inputs
CompletedPublication date: 12/08/2024TUFLOW control and input files for all FRMS simulations, check files included for one event. See "READ ME_FCT FRMS_all runs log.xlsx". 'Read me' tab describes .tcf files, 'log'... -
Spatial flood layers (post processed layers - not direct model outputs)
6_FCT FRMS - Flood Planning Layers
CompletedPublication date: 12/08/2024FPA - Flood Planning Areas based on the DFE (minor overland, major overland, mainstream) and Flood Planning Level FPCCs - Example Flood Planning Constraint Categories FRPs -... -
Hydrological, Hydraulic and flood damage model input files
2_FCT FRMS - Hydrologic Model
CompletedPublication date: 12/08/2024WBNM hydrologic model inputs and results. See "240814_FCT FRMS_SES Data Portal Contents.xlsx" for full description. -
Dataset handover checklist and description
SES Data Portal Contents
CompletedPublication date: 12/08/2024Description of all data uploaded to SES Data Portal including an overview and full list of files. -
Report PDFs - all volumes
Lithgow Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 01/08/2023Lithgow Floodplain Risk Management Study and Plan - Reports -
Hydrological, Hydraulic and flood damage model input files
North Sydney LGA wide Floodplain Risk Management Study and Plan - Flood...
CompletedPublication date: 28/11/2022North Sydney LGA wide Floodplain Risk Management Study and Plan Flood Model and Results -
Spatial flood layers (post processed layers - not direct model outputs)
North Sydney LGA wide Floodplain Risk Management Study and Plan - Spatial...
CompletedPublication date: 28/11/2022spatial flood extent layers Shape files -
Dataset handover checklist and description
North Sydney LGA wide Floodplain Risk Management Study and Plan - Flood...
CompletedPublication date: 28/11/2022Spreadsheets used for the Flood Damages Estimations -
Dataset handover checklist and description
North Sydney LGA wide Floodplain Risk Management Study and Plan - Handover...
CompletedPublication date: 28/11/2022Handover Checklist -
Report PDFs - all volumes
North Sydney LGA-wide Floodplain Risk Management Study and Plan - Report
CompletedPublication date: 28/11/2022Final report for North Sydney LGA wide Floodplain Risk Management Study and report -
Management options
Goulburn Floodplain Risk Management Study and Plan - Management Options...
CompletedPublication date: 06/07/2022Damages spreadsheets used for assessing management options -
Hydrological, Hydraulic and flood damage model input files
Goulburn Floodplain Risk Management Study and Plan - Hydraulic and hydrologic models
CompletedPublication date: 06/07/2022Hydraulic and hydrologic models. Results are uploaded to separate dataset. Hydraulic model has been updated to include missing files. -
Hydrological, Hydraulic and flood damage pre-processed model output files
Goulburn Floodplain Risk Management Study and Plan - Model results
CompletedPublication date: 06/07/2022Model results from the hydraulic model Model results has been updated to include missing files. -
Report PDFs - all volumes
Goulburn Floodplain Risk Management Study and Plan - report
CompletedPublication date: 06/07/2022Final project report in pdf format. All volumes. -
Report PDFs - all volumes
Little Creek Catchment Floodplain Risk Management Study and Plan - Reports
CompletedPublication date: 21/02/2022Final Little Creek Floodplain Risk Management Study and Plan reports in PDF format. -
Report PDFs - all volumes
Woolooware Bay Floodplain Risk Management Study & Plan - Report
CompletedPublication date: 11/02/2022PDF copy of final report. -
Spatial flood layers (post processed layers - not direct model outputs)
Woolooware Bay Floodplain Risk Management Study & Plan - Hydraulic Model...
CompletedPublication date: 11/02/2022Hydraulic model results for report figures.