-
Hydrological, Hydraulic and flood damage model input files
TUFLOW Model
CompletedPublication date: 14/06/2024Tuflow Model -
Hydrological, Hydraulic and flood damage pre-processed model output files
Raw TUFLOW Results
CompletedPublication date: 14/06/2024Raw Results -
Hydrological, Hydraulic and flood damage pre-processed model output files
Hydrology
CompletedPublication date: 14/06/2024WBNM -
All Other Required Data
Options Analysis
CompletedPublication date: 14/06/2024Damages and Options Assessment -
Spatial flood layers (post processed layers - not direct model outputs)
Model Outputs
CompletedPublication date: 14/06/2024Raster and Vector Output Data -
Report PDFs - all volumes
Flood Study and Floodplain Risk Management Study and Plan
CompletedPublication date: 14/06/2024Revised flood study and floodplain risk management Study and plan. -
Dataset handover checklist and description
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017Complete report -
Aerial Imagery
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017EPSG28356 -
Hydrological, Hydraulic and flood damage model input files
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017MIKE-11 -
Plans for works
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017Concept design, Civil Model, DWG -
Hydrological, Hydraulic and flood damage pre-processed model output files
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017MIKE-11 -
Spatial flood layers (post processed layers - not direct model outputs)
Brandy & Water Creek Bridge Investigation & Design of Creek Modification -...
CompletedPublication date: 01/05/2014Updated -
Hydrological, Hydraulic and flood damage model input files
Brandy & Water Creek Bridge Investigation & Design of Creek Modification -...
CompletedPublication date: 01/05/2014SOBEK -
Report PDFs - all volumes
Brandy & Water Creek Bridge Investigation & Design of Creek Modification - Report
CompletedPublication date: 01/05/2014Complete report -
Survey Information – all required
Brandy & Water Creek Bridge Investigation & Design of Creek Modification - Survey
CompletedPublication date: 01/05/2014Survey data, cross sections, property survey -
Hydrological, Hydraulic and flood damage pre-processed model output files
Brandy & Water Creek Bridge Investigation & Design of Creek Modification -...
CompletedPublication date: 01/05/2014SOBEK -
Spatial flood layers (post processed layers - not direct model outputs)
Brandy & Water Creek Bridge Investigation & Design of Creek Modification - Hazard
CompletedPublication date: 01/05/2014High, medium and low risk precinct -
Spatial flood layers (post processed layers - not direct model outputs)
Brandy & Water Creek Bridge Investigation & Design of Creek Modification - GIS
CompletedPublication date: 01/05/2014GIS layers + figures -
Report PDFs - all volumes
Allans Creek Flood Study, Allans Creek FRMS, and Allans Creek FRMP -...
CompletedPublication date: 05/09/2008Complete report -
Report PDFs - all volumes
Allans Creek - Floodplain Risk Management Study (Revised) - Appendices
CompletedPublication date: 01/09/2006Appendix A-I