-
Report PDFs - all volumes
Final report Redbank Creek Flood Study
CompletedPublication date: 17/04/2025The final report provides a comprehensive summary of the project's objectives, data collection and review, methodology, key flood modelling results, consequences of flooding on... -
Hydrological, Hydraulic and flood damage model input files
Hydrological model input files
CompletedPublication date: 17/04/2025Hydrological model input files for all design events. -
Hydrological, Hydraulic and flood damage model input files
TUFLOW Hydraulic model input files
CompletedPublication date: 17/04/2025TUFLOW control and input files for all design event simulations. See "TUFLOW_modelling_log.xlsx" describing simulated event/scenario combinations. -
Report PDFs - all volumes
Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan March 2025
CompletedPublication date: 09/04/2025Lamberts Gully REA - ID 1227 Dam Safety Emergency Plan March 2025 -
Hydrological, Hydraulic and flood damage pre-processed model output files
Marulan FRMS&P Mitigation Hydraulic outputs
CompletedPublication date: 04/04/2025Marulan FRMS&P Mitigation Hydraulic outputs -
Hydrological, Hydraulic and flood damage model input files
Marulan FRMS&P Hydraulic Model and Flood Damages
CompletedPublication date: 04/04/2025Marulan FRMSP Hydarulic Model and Flood Damages -
Spatial flood layers (post processed layers - not direct model outputs)
Marulan FRMS&P Hydraulic Output
CompletedPublication date: 04/04/2025Marulan FRMS&P Hydraulic Output -
Report PDFs - all volumes
1_Willinga Lk FRMS - Final Reports
CompletedPublication date: 25/03/2025The reporting for the Willinga Lake Flood Study and Floodplain Risk Management Study and Plan is separated into three report volumes as follows: ▪ Volume 1: Flood Study Report... -
Report PDFs - all volumes
Final Reports
CompletedPublication date: 19/03/2025The Flood Study, Floodplain Risk Management Study and Floodplain Risk Management Plan documents -
Report PDFs - all volumes
Coolamon Flood Study - Flood Study Report
CompletedPublication date: 01/03/2025Coolamon Flood Study - Flood Study Report -
Spatial flood layers (post processed layers - not direct model outputs)
Hay and Maude FRMS&P - Spatial Mapping Layers
CompletedPublication date: 01/03/2025Hay and Maude Flood Risk Management Study and Plan - Spatial Mapping Layers -
Report PDFs - all volumes
Hay and Maude Flood Study Report
CompletedPublication date: 01/03/2025Hay and Maude Flood Study Report -
Report PDFs - all volumes
Hay and Maude FRMS&P Report
CompletedPublication date: 01/03/2025Hay and Maude Flood Risk Management Study and Plan Report -
Report PDFs - all volumes
Tocumwal and Barooga Flood Study Final Report
CompletedPublication date: 17/02/2025This report dataset contains the main report and figures, followed by Appendices A to I. Murray River flood map outputs are provided in Appendix D. The major overland flooding... -
Report PDFs - all volumes
North Creek Warners Bay Flood Study January 2025 Final Report - All...
CompletedPublication date: 25/01/2025This document constitutes the first and second stages of the management process for the North Creek catchment. It presents a compilation of the data collected and has defined... -
Report PDFs - all volumes
St Marys Levee Flood Protection Upgrade Design Reports
CompletedPublication date: 31/12/2024The dataset contains the following reports: PA2857-RHD-XX-ZZ-RP-Z-0001-St Marys Levee Flooding Report - v12 - incl Appendices.pdf PA2857-RHD-ME-01- Byrnes Creek Culvert Flood... -
Investigation and Design
St Marys Levee Flood Protection Upgrade Design Flooding Package
CompletedPublication date: 31/12/2024St Marys Levee Flood Protection Upgrade Design Flooding Package including flood model and modelling results -
Investigation and Design
St Marys Levee Flood Protection Upgrade Design Drawings and Costing
CompletedPublication date: 31/12/2024Detail Design Drawings and associated costing for the proposed works -
Hydrological, Hydraulic and flood damage pre-processed model output files
Lachlan FMP Hydraulic Model
CompletedPublication date: 12/12/2024Lachlan TUFLOW hydraulic model for : FMP3 FMP4 FMP5 -
Report PDFs - all volumes
Tweed and Brunswick Rivers flood warning improvement Final Report
CompletedPublication date: 02/12/2024This document summarises a literature review and gap analysis of the existing flood warning network to identify recommendations related to the improvement of flood warning...