-
Dataset handover checklist and description
Detailed Design Report - West Street Swale - Supporting Documents
CompletedPublication date: 07/12/2020Review of Environmental Factors, Safety in Design Report, Quantity Surveyor Report -
Report PDFs - all volumes
HEWITTS CREEK FLOOD STUDY 2019 - Volume 1 & 2
CompletedPublication date: 01/12/2019HEWITTS CREEK FLOOD STUDY 2019 - Volume 1 & 2 -
Hydrological, Hydraulic and flood damage pre-processed model output files
Duck Creek Flood Study - Hydraulic Model Output
CompletedPublication date: 31/05/2019TUFLOW -
Hydrological, Hydraulic and flood damage pre-processed model output files
Duck Creek Flood Study - Hydrologic Model Output
CompletedPublication date: 31/05/2019WBNM -
Spatial flood layers (post processed layers - not direct model outputs)
Duck Creek Flood Study - GIS
CompletedPublication date: 31/05/2019Also includes extents, hydraulic categorisation and peak envelope grids. -
Hydrological, Hydraulic and flood damage model input files
Duck Creek Flood Study - Hydrologic Model Input
CompletedPublication date: 31/05/2019WBNM -
Hydrological, Hydraulic and flood damage pre-processed model output files
Duck Creek Flood Study - Hydraulic Model Input
CompletedPublication date: 31/05/2019TUFLOW -
Collected Data
Duck Creek Flood Study - Collected Data
CompletedPublication date: 31/05/2019Historical data Rainfall data -
Emergency Response Planning
Duck Creek Flood Study - FERC
CompletedPublication date: 31/05/2019Trimmed, design blockage -
Survey Information – all required
Duck Creek Flood Study - Survey
CompletedPublication date: 31/05/2019Five folders -
Dataset handover checklist and description
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017Complete report -
Report PDFs - all volumes
Debris Control Screens - Report
CompletedPublication date: 22/06/2017Complete report -
Report PDFs - all volumes
Wollongong City (Gurungaty Waterway) Catchment Floodplain Risk Management...
CompletedPublication date: 01/11/2015Volume 1 - Main Report, Volume 2 - Figures, Volume 2 - Appendix B and maps -
Report PDFs - all volumes
Railway Culvert Upgrade at Tramway Creek - Report
CompletedPublication date: 25/07/2014Report and appendices -
Report PDFs - all volumes
Tramway Creek Culvert Upgrade - Report
CompletedPublication date: 01/07/2014Detailed Design Report (Rev C) -
Report PDFs - all volumes
Brandy & Water Creek Bridge Investigation & Design of Creek Modification - Report
CompletedPublication date: 01/05/2014Complete report -
Report PDFs - all volumes
Brandy & Water Creek- Investigation & Design of Creek Modification
CompletedPublication date: 01/05/2014Report only. -
Report PDFs - all volumes
Lake Illawarra Floodplain Risk Management Plan - Report
CompletedPublication date: 01/01/2012Complete report -
Report PDFs - all volumes
Lake Illawarra Floodplain Risk Management Study
CompletedPublication date: 01/01/2012Report only. In 4 parts. -
Report PDFs - all volumes
Mullet Creek, West Dapto Extension of Flood Model - Hydrologic and Hydraulic...
CompletedPublication date: 01/12/2011An extension to the Mullet and Brooks Creeks Floodplain Risk Management Study & Plan. Hydrologic and hydraulic report.