Plans for works
Concept Design Report - Bellambi Gully Channel Improvement Works Between the ...
CompletedPublication date: 07/12/2020Civil Design, Quantity Surveyor Report, Safety in Design Report, Survey -
Plans for works
Detailed Design Report - West Street Swale - Civil Design
CompletedPublication date: 07/12/2020Survey, Civil Plans -
Dataset handover checklist and description
Detailed Design Report - West Street Swale - Model Files
CompletedPublication date: 07/12/2020TUFLOW model input and output files including hydrology -
Hydrological, Hydraulic and flood damage model input files
Concept Design Report - Bellambi Gully Channel Improvement Works Between the ...
CompletedPublication date: 07/12/2020Tuflow model files -
Report PDFs - all volumes
Concept Design Report - Bellambi Gully Channel Improvement Works Between the ...
CompletedPublication date: 07/12/2020Concept design report for the Bellambi Gully Scheme -
Dataset handover checklist and description
Detailed Design Report - West Street Swale - Supporting Documents
CompletedPublication date: 07/12/2020Review of Environmental Factors, Safety in Design Report, Quantity Surveyor Report -
Dataset handover checklist and description
Detailed Design Report - West Street Swale - Report
CompletedPublication date: 07/12/2020Detailed Design Report -
Hydraulic modelling post processed files for AVIs
Fairy & Cabbage Tree Creeks Flood Study - TUFLOW Hydraulic Model Post-Process...
CompletedPublication date: 26/06/2020Post-processed outputs from the TUFLOW hydraulic model as used in flood mapping and reporting. Includes .asc raster grids, GIS files and WaterRide outputs for ARR 1987 peak... -
Hydrological, Hydraulic and flood damage model input files
Fairy & Cabbage Tree Creeks Flood Study - WBNM hydrologic model & results
CompletedPublication date: 26/06/2020WBNM hydrologic model & results. Appropriateness of 'total' flood flows from any location within this model requires careful consideration by the user, particularly due to... -
Hydrological, Hydraulic and flood damage pre-processed model output files
Fairy & Cabbage Tree Creeks Flood Study - TUFLOW Hydraulic Model RAW Outputs
CompletedPublication date: 26/06/2020Fairy & Cabbage Tree Creeks Flood Study - ARR87 Design TUFLOW RAW Outputs -
Hydrological, Hydraulic and flood damage model input files
Fairy & Cabbage Tree Creeks Flood Study - TUFLOW Hydraulic Model Input Files
CompletedPublication date: 26/06/2020TUFLOW model run / input files for calibration, ARR 1987 design, climate change and sensitivty simulations. -
Report PDFs - all volumes
Fairy & Cabbage Tree Creeks Flood Study - Final Report and Mapping
CompletedPublication date: 26/06/2020PDF Copies of Volume 1 final report and Volume 2 flood mapping. -
Collected Data
Fairy & Cabbage Tree Creeks Flood Study - Collated Data
CompletedPublication date: 26/06/2020FCT Flood Study - Collated Data LiDAR Survey WAE Hydrometric data -
Hydrological, Hydraulic and flood damage model input files
Allans Creek Flood Study - TUFLOW Hydraulic Model Input Files
CompletedPublication date: 11/12/2019TUFLOW model run / input files for calibration, ARR 1987 design, climate change and sensitivty simulations. -
Hydraulic modelling post processed files for AVIs
Allans Creek Flood Study - TUFLOW Hydraulic Model Post-Processed Outputs
CompletedPublication date: 11/12/2019Post-processed outputs from the TUFLOW hydraulic model as used in flood mapping and reporting. Includes .asc raster grids, GIS files and WaterRide outputs for ARR 1987 peak... -
Hydrological, Hydraulic and flood damage pre-processed model output files
Allans Creek Flood Study - TUFLOW Hydraulic Model RAW Outputs
CompletedPublication date: 11/12/2019TUFLOW Hydraulic Model RAW Outputs including all 2D and 1D timeseries output and unflitered maximums + limited check files -
Report PDFs - all volumes
Allans Creek Flood Study - Report and Mapping
CompletedPublication date: 11/12/2019PDF Copies of final report and flood mapping. -
Hydrological, Hydraulic and flood damage model input files
Allans Creek Flood Study - WBNM hydrologic model & results
CompletedPublication date: 11/12/2019WBNM hydrologic model & results. Appropriateness of 'total' flood flows from any location within this model requires careful consideration by the user, particularly due to... -
Dataset handover checklist and description
Towradgi Creek Flood Study - description of the datahandover
CompletedPublication date: 01/12/2019description of the datahandover -
Dataset handover checklist and description
description of the datahandover hewitts
CompletedPublication date: 01/12/2019description of the datahandover