Flood ProjectFloodplain Risk Management Study and Plan
Fairy & Cabbage Tree Creeks FRMS&P 2024
CompletedPublication date: 12/08/2024The Fairy and Cabbage Tree Creeks catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. The catchment...
-
Flood ProjectFloodplain Risk Management Study and Plan
Towradgi Creek Flood Study, Floodplain Risk Management Study & Plan 2023
CompletedPublication date: 26/06/2023Towradgi Creek is located within the Wollongong City Council Local Government Area (LGA). The 7.5km2 catchment incorporates the northern Wollongong suburbs of Tarrawanna,...
-
Flood ProjectFloodplain Risk Management Study and Plan
Mullet Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 05/04/2023The Mullet Creek Floodplain Risk Management Plan (FRMP) has been prepared for Wollongong City Council (hereafter referred to as Council) in accordance with the New South Wales...
-
Flood ProjectConcept Design
Investigation and Concept Design of Ursula Road Scheme, Bulli
CompletedPublication date: 19/12/2022The ‘Combined Catchment of Whartons, Collins and Farrahars Creeks, Bellambi Gully and Bellambi Lake Floodplain Risk Management Study and Plan’ was prepared in 2014 and...
-
Flood ProjectDetailed Design
Detailed Design Report - West Street Swale
CompletedPublication date: 03/12/2020Detailed Design - West Street Swale, Russell Vale
-
Flood ProjectConcept Design
Concept Design Report - Bellambi Gully Channel Improvement Works Between the...
CompletedPublication date: 27/11/2020Concept Design of Bellambi Gully Scheme, Channel, culvert and pipe works downstream of Pioneer Road, Bellmabi
-
Flood ProjectFlood study
Allans Creek Flood Study 2019
CompletedPublication date: 11/12/2019The Allans Creek catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council engaged Advisian (part...
-
Flood ProjectFlood study
HEWITTS CREEK FLOOD STUDY December 2019
CompletedPublication date: 01/12/2019The study area is located within the Wollongong City Council Local Government Area (LGA) and incorporates Slacky, Tramway, Woodlands, Hewitts and Thomas Gibson Creeks. The...
-
Flood ProjectFlood study
Minnegang Creek Flood Study
CompletedPublication date: 23/10/2019The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...
-
Flood ProjectFlood study
Kully Bay Overland Flow Study
CompletedPublication date: 23/10/2019The Kully Bay catchment is located in the suburb of Warrawong, in the Wollongong City LGA. The catchment covers an area of approximately 150 hectares and extends from the...
-
Flood ProjectFlood study
Collins Creek Flood Study
CompletedPublication date: 27/09/2019A study to better define flooding and drainage behaviour for study conducted in 2011 in Woonona. A key objective of the study was to assess the impacts of an updated blockage...
-
Flood ProjectFlood study
Wollongong City Flood Study (2019)
CompletedPublication date: 19/08/2019A review of the Wollongong City Flood study has been conducted on behalf of Wollongong City Council (“Council”) for the Wollongong City study area. The purpose of this review...
-
Flood ProjectFlood study
Duck Creek Flood Study
CompletedPublication date: 31/05/2019The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...
-
Flood ProjectFlood study
Review of the Brooks Creek Flood Study
CompletedPublication date: 30/04/2018EXECUTIVE SUMMARY Study Objective SMEC Australia Pty Ltd (SMEC) was commissioned by Wollongong City Council (WCC) to undertake a review of the 2010 Brooks Creek Flood Study and...
-
Flood ProjectFlood study
Mullet Creek Flood Model Update
CompletedPublication date: 13/04/2018Summary The model update of Mullet Creek has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Mullet Creek. The model update was...
-
Flood ProjectConcept Design
Debris Control Structures for Allans Creek, Wollongong - Investigation and...
CompletedPublication date: 13/11/2017Allans Creek is a partly developed catchment within the Wollongong City Council Local Government Area. The catchment has an area of 42 square kilometres and is located to the...
-
Flood ProjectGuidance, Tools and Resources
Lowering of Gurungaty Causeway Concept Design Report
CompletedPublication date: 02/08/2017The Gurungaty Waterway is located 3.5km north of Port Kembla and flows from north to south into Tom Thumb Lagoon. The catchment area for this waterway is approximately 7.3...
-
Flood ProjectConcept Design
Debris Control Screens for Whartons Creek, Farrahars Creek and Bellambi...
CompletedPublication date: 22/06/2017Wollongong City Council (Council) has commissioned Royal HaskoningDHV (RHDHV) to investigate and develop concept designs and an economic business case for four (4) Debris...
-
Flood ProjectDetailed Design
Brandy & Water Creek Bridge Investigation & Design of Creek Modification
CompletedPublication date: 01/05/2014One of the flooding areas identified by the Allans Creek FRMSP is along Brandy and Water Creek in the vicinity of the Darragh Drive, Figtree. This FRMSP identified a number of...
-
Flood ProjectFloodplain Risk Management Plan
Lake Illawarra Floodplain Risk Management Plan
CompletedPublication date: 01/01/2012Lake Illawarra is a shallow coastal lagoon located on the undulating coastal plain between the ocean and the cliffs of the Illawarra Escarpment. The Lake catchment of...