13 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Stonequarry Creek (Picton) Floodplain Risk Management Study and Plan

    Completed
    Publication date: 30/09/2020
    The FRMS&P included a flood study update with ARR 2016 methods and TUFLOW modelling platform. The Flood Study Update included Overland Flooding in the Study Area.

  • Flood Project
    Flood study

    Stonequarry Creek - 2D Modelling & Climate Change Assessment

    Completed
    Publication date: 16/07/2011
    Since the Picton Flood Study Report, 1989 (Department of Water Resources), and subsequent Flood Plain Management Study (1992), there has been significant development in the...

  • Flood Project
    Guidance, Tools and Resources

    Picton Local Flood Policy

    Completed
    Publication date: 01/05/2000
    The primary objective of this policy is to reduce the impact of flooding and flood liability on individual land owners and occupiers and to reduce private and public losses...

  • Flood Project
    Guidance, Tools and Resources

    Stonequarry Creek - Vegetation Management Plan Final

    Completed
    Publication date: 01/04/1996
    The Vegetation Management Plan for Stonequarry Creek has been developed for Wollondilly Shire Council as part of the Stonequarry Creek Floodplain Management Plan and fulfils the...

  • Flood Project
    Guidance, Tools and Resources

    Warragamba - Flood Frequency & Flood Modelling Studies

    Completed
    Publication date: 01/10/1992
    This report describes the work that has been carried out by Webb, McKeown & Associates from April, 1992, in accordance with a Brief dated 16 April, 1992 issued by the...

  • Flood Project
    Floodplain Risk Management Study

    Stonequarry Creek Floodplain Management Study

    Completed
    Publication date: 01/09/1992
    Wollondilly Shire Council, through the Picton Floodplain Management Committee, developed a floodplain management strategy for the Stonequarry Creek Floodplain in Picton. The...

  • Flood Project
    Guidance, Tools and Resources

    Warragamba River - Flood Frequency Analysis

    Completed
    Publication date: 01/04/1992
    Flood frequency curves on the Warragamba River at the dam site were developed for past, present and possible future conditions. These curves were developed from a relatively...

  • Flood Project
    Flood study

    Cawdor Flood Study

    Completed
    Publication date: 01/02/1991
    Northrop Consultants have been commissioned by West Coast Developments on a brief prepared by Wollondilly Shire Council to examine the flooding hazard of the Cawdor Urban...

  • Flood Project
    Flood study

    Warragamba Flood Study - Hydrologic Modelling of The Hawkesbury/Nepean Catchment

    Completed
    Publication date: 01/06/1989
    As a result of increases in estimates of Probable Maximum Precipitation (PMP) over the past 40 years it is now apparent that Warragamba Dam is unsafe; even after the current...

  • Flood Project
    Flood study

    Picton Flood Study Report

    Completed
    Publication date: 01/02/1989
    Picton is an urban centre with a population of 2100. It is an important service town for the surrounding district where the major pursuits are dairy farming, horse studs and...

  • Flood Project
    Guidance, Tools and Resources

    Picton - Flood Extent & Hazard

    Completed
    Publication date: 11/11/1111
    Picton flood extent (1% AEP and the PMF) as well as hazard categories (flood fringe and flood way).

  • Flood Project
    Flood study

    Picton / Stonequarry Creek Flood Study (Updated Final Draft)

    Deprecated
    Publication date: 15/09/2017
    Draft Flood Study placed on Exhibition and including incorporation of the 2016 Post Event Analysis (published as Worley Parsons)

  • Flood Project
    Post event flood behaviour reports

    Picton Post Event Analysis - June 2016 Weather and Flood Event (draft)

    Deprecated
    Publication date: 31/10/2016
    Draft Report on the 2016 Flood event that occurred when an existing Flood Study was unpublished.