5 Flood Projects found

None: notspecified River Basin: 412 - Lachlan

Filter Results
  • Flood Project
    Flood Warning Reports

    Upper Lachlan Shire Total Flood Warning System

    Completed
    Publication date: 10/01/2023
    The overall objective of the project is to design, document, and implement cost effective, fit for purpose flood warning systems for the Villages of Crookwell, Taralga, Gunning,...

  • Flood Project
    Flood study

    The Village of Crookwell Flood Study

    Completed
    Publication date: 01/02/2014
    The village of Crookwell has a population of about 2,200 and is located about 45 km north of Goulburn on the Crookwell Road. The village is located in the headwaters of the...

  • Flood Project
    Flood study

    The Village of Gunning Flood Study

    Completed
    Publication date: 01/02/2014
    The Village of Gunning has a population of about 550 and is located on the Hume Highway midway between Yass and Goulburn in the headwaters of the Lachlan Valley. Meadow Creek...

  • Flood Project
    Flood study

    The Village of Taralga Flood Study

    Completed
    Publication date: 01/02/2014
    Taralga has a population of about 350 and is located on Corroboree Creek which flows in a north-easterly direction through the village area. It drains a small tributary...

  • Flood Project
    Flood study

    The Village of Collector Flood Study

    Completed
    Publication date: 01/02/2014
    Collector has a population of about 150 and is located on the western side of the Federal Highway in the catchment of Collector Creek, which drains an area of about 140 square...