Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

7 Flood Projects found

Tags: Namoi River

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Manilla Floodplain Risk Management Study and Draft Plan

    Completed
    Publication date: 13/02/2018
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Floodplain Risk Management Plan

    Bendemeer Floodplain Risk Management Plan

    Completed
    Publication date: 09/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Floodplain Risk Management Study

    Bendemeer Floodplain Risk Management Study

    Completed
    Publication date: 08/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Flood study

    Barraba Flood Study

    Completed
    Publication date: 01/04/2012
    The upper catchments of the Manilla River are located to the northwest of Tamworth in the New England region of the NSW. The river drains a large (771 square kilometres)...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Post event flood behaviour reports

    Flood Intelligence Collection and Review for the Macdonald, Peel and Namoi Ri...

    Completed
    Publication date: 01/04/2009
    Serious flooding was experienced in the Macdonald, Peel and Namoi River Valleys from 28th to 30th November 2008. The State Emergency Service (SES) is the combat agency for...

  • Flood Project
    Post event flood behaviour reports

    Namoi & Gwydir River Valley - Report on the Hydrologic Features of the Floods...

    Completed
    Publication date: 01/07/1956
    This Report is intended to record the essential hydrographic facts and observations of the flood in the Namoi and Gwydir Rivers during February 1955, and to compile the large...