15 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Barraba Floodplain Risk Management Study and Plan

    Completed
    Publication date: 16/02/2018
    Barraba town is located 90 km to the northwest of Tamworth in the New England region of NSW. The town is located on the Manilla River, which drains to Split Rock Dam and the...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Manilla Floodplain Risk Management Study and Draft Plan

    Completed
    Publication date: 13/02/2018
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Floodplain Risk Management Plan

    Bendemeer Floodplain Risk Management Plan

    Completed
    Publication date: 09/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Floodplain Risk Management Study

    Bendemeer Floodplain Risk Management Study

    Completed
    Publication date: 08/08/2016
    Bendemeer is located beside the Macdonald River approximately 42km north-east of Tamworth, along the New England Highway. The catchment has an area of about 1140 square...

  • Flood Project
    Flood study

    Nundle and Woolomin Flood Study and Floodplain Risk Management Study and Plan

    Completed
    Publication date: 01/05/2012
    The study area consists of the small township of Nundle and the village of Woolomin within the Tamworth Regional Council Local Government Area. Nundle is located on the right...

  • Flood Project
    Flood study

    Bendemeer Flood Study

    Completed
    Publication date: 25/04/2012
    The subject area is located along the MacDonald River within the town of Bendemeer, situated approximately 40km north-east of Tamworth. The catchment leading to the town of...

  • Flood Project
    Flood study

    Manilla Flood Study

    Completed
    Publication date: 25/04/2012
    The upper catchments of the Manilla and Namoi River catchments are located to the northwest of Tamworth in the New England region of NSW. Both rivers drain large catchments...

  • Flood Project
    Flood study

    Barraba Flood Study

    Completed
    Publication date: 01/04/2012
    The upper catchments of the Manilla River are located to the northwest of Tamworth in the New England region of the NSW. The river drains a large (771 square kilometres)...

  • Flood Project
    Guidance, Tools and Resources

    Namoi Catchment - Water Resources and Management Overview

    Completed
    Publication date: 01/02/2011
    The Namoi River is one of the Murray-Darling Basin's major NSW sub-catch merits. It covers an area of about 42,000 km from the Great Dividing Range near Tamworth to the Barwon...

  • Flood Project
    Post event flood behaviour reports

    Flood Intelligence Collection and Review for the Macdonald, Peel and Namoi Rivers

    Completed
    Publication date: 01/04/2009
    Serious flooding was experienced in the Macdonald, Peel and Namoi River Valleys from 28th to 30th November 2008. The State Emergency Service (SES) is the combat agency for...

  • Flood Project
    Guidance, Tools and Resources

    Peel River at Tamworth - Hydraulic Modelling

    Completed
    Publication date: 01/12/2006
    This report details the results of an investigation carried out for Tamworth Regional Council (TRC) to upgrade the FPLAIN hydraulic mode! of the Peel River floodplain at...

  • Flood Project
    Visual Levee Audits

    West Tamworth Levee Design Drawings

    Completed
    Publication date: 05/09/2001
    Detailed figures illustrating detention basins, burrow area, levees and other miscellaneous items. Chainage diagrams also presented.

  • Flood Project
    Construction projects - Work as executed plans

    Tamworth West - Levee Design Drawings (With Sign off Signatures - Works as Executed)

    Completed
    Publication date: 01/09/1998
    Tamworth West - Levee Design Drawings (With Sign off Signatures - Works as Executed)

  • Flood Project
    Review of Environmental Factors

    Tamworth - City Levee Upgrade - Review of Environmental Factors

    Completed
    Publication date: 01/01/1995
    Tamworth City Council proposes to upgrade its City Levee. These works follow from the recommendations of the "Floodplain Management Plan" for the City of Tamworth and Council's...

  • Flood Project
    Post event flood behaviour reports

    Namoi & Gwydir River Valley - Report on the Hydrologic Features of the...

    Completed
    Publication date: 01/07/1956
    This Report is intended to record the essential hydrographic facts and observations of the flood in the Namoi and Gwydir Rivers during February 1955, and to compile the large...