Flood ProjectFloodplain Risk Management Study and Plan
Lower Shoalhaven River Floodplain Management Study & Plan - Climate Change Assessment
CompletedPublication date: 01/08/2011The main objective of this study is to amend the existing Lower Shoalhaven River Floodplain Risk Management Study and Plan to incorporate the predicted impacts of climate...
-
Flood ProjectVisual Levee Audits
Terara Levee - Final Design Report
CompletedPublication date: 01/03/2005In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...
-
Flood ProjectGeotech Report on levee
Terara Levee Restoration & Upgrade Project - Additional Geotechnical...
CompletedPublication date: 01/09/2003This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...
-
Flood ProjectVisual Levee Audits
Terara Levee Audit Final Report
CompletedPublication date: 25/03/2002Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...
-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...