5 Flood Projects found

Tags: Shoalhaven River Ferry Lane None: shoalhaven-city-council

Filter Results
  • Flood Project
    Visual Levee Audits

    Terara Levee - Final Design Report

    Completed
    Publication date: 01/03/2005
    In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...

  • Flood Project
    Geotech Report on levee

    Terara Levee Restoration & Upgrade Project - Additional Geotechnical...

    Completed
    Publication date: 01/09/2003
    This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...

  • Flood Project
    Floodplain Risk Management Plan

    Terara Village Floodplain Management Plan

    Completed
    Publication date: 26/02/2002
    The Shoalhaven River catchment covers an area of 7000 square kilometres with approximately 120 square kilometres of floodplain downstream of Nowra. The village of Terara is...

  • Flood Project
    Floodplain Risk Management Study

    Terara Village Floodplain Management Study

    Completed
    Publication date: 26/02/2002
    This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...

  • Flood Project
    Flood study

    Shoalhaven City Council - Terara Levee Audit

    Completed
    Publication date: 02/10/2001
    Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...