-
Flood ProjectFloodplain Risk Management Plan
Kangaroo Valley Floodplain Risk Management Plan
CompletedPublication date: 01/04/2016The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...
-
Flood ProjectFloodplain Risk Management Study
Kangaroo Valley Floodplain Risk Management Study
CompletedPublication date: 01/04/2016The Kangaroo River is a tributary of the Shoalhaven River, on the south coast of New South Wales. The river originates from within the Budderoo National Park, from where it...
-
Flood ProjectFloodplain Risk Management Study and Plan
Lower Shoalhaven River Floodplain Management Study & Plan - Climate Change Assessment
CompletedPublication date: 01/08/2011The main objective of this study is to amend the existing Lower Shoalhaven River Floodplain Risk Management Study and Plan to incorporate the predicted impacts of climate...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven River Hazard and Hydraulic Categories
CompletedPublication date: 01/05/2008Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River Entrance Management Plan for Flood Mitigation
CompletedPublication date: 01/11/2006If the entrance of the Shoalhaven River at Shoalhaven Heads were to remain closed during a flood, water levels would be significantly higher for longer in some parts of the...
-
Flood ProjectVisual Levee Audits
Terara Levee - Final Design Report
CompletedPublication date: 01/03/2005In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...
-
Flood ProjectGeotech Report on levee
Terara Levee Restoration & Upgrade Project - Additional Geotechnical...
CompletedPublication date: 01/09/2003This report presents the results of an additional geotechnical investigation carried out by Sinclair Knight Merz Pty Ltd along a section of the Shoalhaven River bank known as...
-
Flood ProjectFloodplain Risk Management Plan
Terara Village Floodplain Management Plan
CompletedPublication date: 26/02/2002The Shoalhaven River catchment covers an area of 7000 square kilometres with approximately 120 square kilometres of floodplain downstream of Nowra. The village of Terara is...
-
Flood ProjectFloodplain Risk Management Study
Riverview Road Area - Nowra Floodplain Management Study
CompletedPublication date: 26/02/2002The land on the south bank of the Shoalhaven River downstream of Nowra Bridge has had a history of flooding. This Floodplain Management Study examines flooding issues relating...
-
Flood ProjectFloodplain Risk Management Study
Terara Village Floodplain Management Study
CompletedPublication date: 26/02/2002This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...
-
Flood ProjectFloodplain Risk Management Plan
Riverview Road Area, Nowra - Floodplain Management Plan
CompletedPublication date: 26/02/2002The Shoalhaven River rises approximately 50km inland of Moruya and follows a northerly direction for 170km before turning east for a further 90km to reach the Pacific Ocean at...
-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig Island
CompletedPublication date: 01/09/1992A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...
-
Flood ProjectPost event data collection
Flooding of Shoalhaven River - 1st-3rd August 1990
CompletedPublication date: 01/12/1990On 31st July 1990, a low pressure system developed off the Queensland Coast. This system moved slowly south over the next few days directing easterly winds into most of the NSW...
-
Flood ProjectFlood study
Shoalhaven Milling Company Nowra - Flood Study For Proposed Flour Mill
CompletedPublication date: 01/10/1990The Shoalhaven Milling Company is proposing the development of a Flour Mill on Bolong Road, Nowra, at a site located approximately 300m north-east of their existing milling...
-
Flood ProjectFlood study
Shoalhaven Milling Company - Flood Study For Proposed Mill Extensions
CompletedPublication date: 01/12/1989This flood study has been undertaken for the Shoalhaven Milling Company of Nowra, to investigate flooding at the site of proposed extension to their existing mill. The mill is...
-
Flood ProjectPost event flood behaviour reports
Flooding of the Shoalhaven River 29th April-1st May 1988
CompletedPublication date: 01/05/1988Heavy rainfall in the upper catchment of the Shoalhaven River during the period 29 April to 1 May 1988 resulted in a major flood occurring in the lower reaches of the river....
-
Flood ProjectFlood study
Lower Shoalhaven River Flood Study
CompletedPublication date: 01/01/1977In August 1974 and again in June 1975 two major floods occurred in the Shoalhaven River and large areas of land between Nowra and the coast were inundated for several days....
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Investigation
CompletedPublication date: 01/01/1111The following report has been prepared in an effort to compile as much information as possible regarding the investigations which have been carried out into the resources of the...
-
Flood ProjectGuidance, Tools and Resources
Nowra & Browns Creeks Hazard and Hydraulic Categories 1% AEP
CompletedPublication date: 01/01/1111Hazard and Hydraulic Categories. Extents and categorisations based on the 100-year flood.