Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

66 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study

    Terara Village Floodplain Management Study

    Completed
    Publication date: 26/02/2002
    This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...

  • Flood Project
    Flood study

    Shoalhaven City Council - Terara Levee Audit

    Completed
    Publication date: 02/10/2001
    Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top...

  • Flood Project
    Flood study

    Lake Conjola Entrance Study

    Completed
    Publication date: 04/05/1999
    Lake Conjola is a coastal lake located about 50km south of Nowra on the NSW south coast. The lake has a surface area of approximately 4.3 square kilometres and a catchment area...

  • Flood Project
    Guidance, Tools and Resources

    A Review of Flooding in Callala Creek - Callala Beach Road to Jervis Bay

    Completed
    Publication date: 01/01/1994
    This study has been undertaken at the request of Shoalhaven Council to establish the level of flooding in Callala Creek in the 1 % AEP event, in the vicinity of these proposed...

  • Flood Project
    Floodplain Risk Management Plan

    Sanctuary Point - Floodplain Management Plan Appendix 1

    Completed
    Publication date: 01/02/1993
    This report forms part of a floodplain management study and management plan being prepared by Environmental Management P\y Ltd for that section of Cockrow Creek which passes...

  • Flood Project
    Guidance, Tools and Resources

    Report On Flooding - Walmer St, Sanctuary Point

    Completed
    Publication date: 01/11/1992
    This study was commissioned to investigate and report on the impact of the construction of a sewer pumping station upon flooding at No 153 Walmer Street, Sanctuary Point. The...

  • Flood Project
    Guidance, Tools and Resources

    Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig I...

    Completed
    Publication date: 01/09/1992
    A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...

  • Flood Project
    Flood study

    Sanctuary Point - Flood Study

    Completed
    Publication date: 01/09/1992
    This study deals with flooding in the portion of Sanctuary Point Village bordering Cockrow Creek. The study area extends upstream along Cockrow Creek from Its outlet at St...

  • Flood Project
    Post event data collection

    Flooding of Shoalhaven River - 1st-3rd August 1990

    Completed
    Publication date: 01/12/1990
    On 31st July 1990, a low pressure system developed off the Queensland Coast. This system moved slowly south over the next few days directing easterly winds into most of the NSW...

  • Flood Project
    Flood study

    Shoalhaven Milling Company Nowra - Flood Study For Proposed Flour Mill

    Completed
    Publication date: 01/10/1990
    The Shoalhaven Milling Company is proposing the development of a Flour Mill on Bolong Road, Nowra, at a site located approximately 300m north-east of their existing milling...

  • Flood Project
    Flood study

    Shoalhaven Milling Company - Flood Study For Proposed Mill Extensions

    Completed
    Publication date: 01/12/1989
    This flood study has been undertaken for the Shoalhaven Milling Company of Nowra, to investigate flooding at the site of proposed extension to their existing mill. The mill is...

  • Flood Project
    Post event flood behaviour reports

    Flooding of the Shoalhaven River 29th April-1st May 1988

    Completed
    Publication date: 01/05/1988
    Heavy rainfall in the upper catchment of the Shoalhaven River during the period 29 April to 1 May 1988 resulted in a major flood occurring in the lower reaches of the river....

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River - Entrance Study

    Completed
    Publication date: 01/12/1986
    "The Shoalhaven River entrance at Shoalhaven Heads is often closed to tidal flows when beach sands form a barrier across the river mouth. During those periods the river...

  • Flood Project
    Guidance, Tools and Resources

    Sussex Inlet - Hydrodynamics & Sedimentation

    Completed
    Publication date: 28/02/1985
    "This report focuses on the Sussex Inlet St. Georges Basin region which lies within the boundaries of the Shoalhaven City Council. In accordance with the proposal initially...

  • Flood Project
    Flood study

    Lower Shoalhaven River Flood Study

    Completed
    Publication date: 01/01/1977
    In August 1974 and again in June 1975 two major floods occurred in the Shoalhaven River and large areas of land between Nowra and the coast were inundated for several days....

  • Flood Project
    Guidance, Tools and Resources

    Nowra - Flood Map

    Completed
    Publication date: 11/11/1111
    Hazard and hydraulic categories; extents and categorisations based on the Flood Planning Level (1% AEP flood + 500mm freeboard).

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River - Flood History

    Completed
    Publication date: 01/01/1111
    This document contains a compilation of extracts from documents relating to flooding in the Shoalhaven River between 1817 and 1980. It includes extracts from: News reports...

  • Flood Project
    Guidance, Tools and Resources

    Shoalhaven River - Investigation

    Completed
    Publication date: 01/01/1111
    The following report has been prepared in an effort to compile as much information as possible regarding the investigations which have been carried out into the resources of the...

  • Flood Project
    Guidance, Tools and Resources

    Tomerong, Erowal Creeks and Worrowing Waterway Hazard and Hydraulic Categorie...

    Completed
    Publication date: 01/01/1111
    Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).

  • Flood Project
    Guidance, Tools and Resources

    Nowra & Browns Creeks Hazard and Hydraulic Categories 1% AEP

    Completed
    Publication date: 01/01/1111
    Hazard and Hydraulic Categories. Extents and categorisations based on the 100-year flood.