-
Flood ProjectFloodplain Risk Management Study
Terara Village Floodplain Management Study
CompletedPublication date: 26/02/2002This Floodplain Management Study examines flooding issues relating to the village of Terara and adjoining properties which are located on the south bank of the Shoalhaven River...
-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top...
-
Flood ProjectFlood study
Lake Conjola Entrance Study
CompletedPublication date: 04/05/1999Lake Conjola is a coastal lake located about 50km south of Nowra on the NSW south coast. The lake has a surface area of approximately 4.3 square kilometres and a catchment area...
-
Flood ProjectGuidance, Tools and Resources
A Review of Flooding in Callala Creek - Callala Beach Road to Jervis Bay
CompletedPublication date: 01/01/1994This study has been undertaken at the request of Shoalhaven Council to establish the level of flooding in Callala Creek in the 1 % AEP event, in the vicinity of these proposed...
-
Flood ProjectFloodplain Risk Management Plan
Sanctuary Point - Floodplain Management Plan Appendix 1
CompletedPublication date: 01/02/1993This report forms part of a floodplain management study and management plan being prepared by Environmental Management P\y Ltd for that section of Cockrow Creek which passes...
-
Flood ProjectGuidance, Tools and Resources
Report On Flooding - Walmer St, Sanctuary Point
CompletedPublication date: 01/11/1992This study was commissioned to investigate and report on the impact of the construction of a sewer pumping station upon flooding at No 153 Walmer Street, Sanctuary Point. The...
-
Flood ProjectGuidance, Tools and Resources
Lower Shoalhaven - A Report On The Impact Of Construction of a Levee on Pig I...
CompletedPublication date: 01/09/1992A levee is proposed along the southern shoreline of Pig Island to retain and drain saturated sands and silts pumped across to the island from a sand washing plant at Terrara. At...
-
Flood ProjectFlood study
Sanctuary Point - Flood Study
CompletedPublication date: 01/09/1992This study deals with flooding in the portion of Sanctuary Point Village bordering Cockrow Creek. The study area extends upstream along Cockrow Creek from Its outlet at St...
-
Flood ProjectPost event data collection
Flooding of Shoalhaven River - 1st-3rd August 1990
CompletedPublication date: 01/12/1990On 31st July 1990, a low pressure system developed off the Queensland Coast. This system moved slowly south over the next few days directing easterly winds into most of the NSW...
-
Flood ProjectFlood study
Shoalhaven Milling Company Nowra - Flood Study For Proposed Flour Mill
CompletedPublication date: 01/10/1990The Shoalhaven Milling Company is proposing the development of a Flour Mill on Bolong Road, Nowra, at a site located approximately 300m north-east of their existing milling...
-
Flood ProjectFlood study
Shoalhaven Milling Company - Flood Study For Proposed Mill Extensions
CompletedPublication date: 01/12/1989This flood study has been undertaken for the Shoalhaven Milling Company of Nowra, to investigate flooding at the site of proposed extension to their existing mill. The mill is...
-
Flood ProjectPost event flood behaviour reports
Flooding of the Shoalhaven River 29th April-1st May 1988
CompletedPublication date: 01/05/1988Heavy rainfall in the upper catchment of the Shoalhaven River during the period 29 April to 1 May 1988 resulted in a major flood occurring in the lower reaches of the river....
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Entrance Study
CompletedPublication date: 01/12/1986"The Shoalhaven River entrance at Shoalhaven Heads is often closed to tidal flows when beach sands form a barrier across the river mouth. During those periods the river...
-
Flood ProjectGuidance, Tools and Resources
Sussex Inlet - Hydrodynamics & Sedimentation
CompletedPublication date: 28/02/1985"This report focuses on the Sussex Inlet St. Georges Basin region which lies within the boundaries of the Shoalhaven City Council. In accordance with the proposal initially...
-
Flood ProjectFlood study
Lower Shoalhaven River Flood Study
CompletedPublication date: 01/01/1977In August 1974 and again in June 1975 two major floods occurred in the Shoalhaven River and large areas of land between Nowra and the coast were inundated for several days....
-
Flood ProjectGuidance, Tools and Resources
Nowra - Flood Map
CompletedPublication date: 11/11/1111Hazard and hydraulic categories; extents and categorisations based on the Flood Planning Level (1% AEP flood + 500mm freeboard).
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Flood History
CompletedPublication date: 01/01/1111This document contains a compilation of extracts from documents relating to flooding in the Shoalhaven River between 1817 and 1980. It includes extracts from: News reports...
-
Flood ProjectGuidance, Tools and Resources
Shoalhaven River - Investigation
CompletedPublication date: 01/01/1111The following report has been prepared in an effort to compile as much information as possible regarding the investigations which have been carried out into the resources of the...
-
Flood ProjectGuidance, Tools and Resources
Tomerong, Erowal Creeks and Worrowing Waterway Hazard and Hydraulic Categorie...
CompletedPublication date: 01/01/1111Hazard and Hydraulic Categories. Extents and categorisations based on Flood Planning Level (1% AEP flood + 500mm freeboard).
-
Flood ProjectGuidance, Tools and Resources
Nowra & Browns Creeks Hazard and Hydraulic Categories 1% AEP
CompletedPublication date: 01/01/1111Hazard and Hydraulic Categories. Extents and categorisations based on the 100-year flood.