-
Flood ProjectFloodplain Risk Management Study and Plan
Little Creek Catchment Floodplain Risk Management Study and Plan
CompletedPublication date: 21/02/2022Introduction Catchment Simulation Solutions has been commissioned to prepare the Little Creek Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...
-
Flood ProjectFloodplain Risk Management Study and Plan
South Creek Floodplain Risk Management Study and Plan
CompletedPublication date: 27/04/2020Introduction Penrith City Council, through its Floodplain Risk Management Committee and Advisian Pty Ltd, has completed a Floodplain Risk Management Study for those sections of...
-
Flood ProjectFloodplain Risk Management Study and Plan
Penrith CBD Floodplain Risk Management Study and Plan
CompletedPublication date: 23/03/2020Introduction Molino Stewart has been commissioned to prepare the Penrith CBD Floodplain Risk Management Study and Plan (FRMS&P) on behalf of Penrith City Council (Council)...
-
Flood ProjectFloodplain Risk Management Study and Plan
St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan
CompletedPublication date: 23/03/2020Introduction Lyall & Associates has been commissioned to prepare the St Marys (Byrnes Creek) Catchment Floodplain Risk Management Study and Plan (FRMS&P) on behalf of...
-
Flood ProjectFlood study
Peach Tree and Lower Surveyors Creek Flood Study
CompletedPublication date: 01/04/2019The Peach Tree and Lower Surveyors Creeks Flood Study covers an area of 1,250 hectares within the Penrith City Council Local Government Area (LGA). As shown in Figure 1, the...
-
Flood ProjectFlood study
Nepean River Flood Study
CompletedPublication date: 12/11/2018The Hawkesbury-Nepean River catchment is one of the largest coastal basins in NSW with an area of 21,400 square kilometres. The catchment at Penrith is 52% of the total area and...
-
Flood ProjectFlood study
College, Orth and Werrington Creeks Catchment Overland Flow Flood Study
CompletedPublication date: 05/06/2017The College, Orth and Werrington Creeks Catchment Overland Flow Flood Study was prepared for Penrith City Council to identify main stream and overland flood behaviour across the...
-
Flood ProjectFlood study
Little Creek Catchment Overland Flow Flood Study
CompletedPublication date: 01/06/2017The Little Creek catchment is located north of the M4 Motorway and drains to South Creek with the study area covering parts of the suburbs of Oxley Park, Colyton, St Marys and...
-
Flood ProjectFlood study
Penrith CBD Detailed Overland Flow Flood Study
CompletedPublication date: 07/07/2015Penrith City Council completed a broad-scale overland flow flood study (”Overview Study”) in October 2006 (Cardno Lawson Treloar, 2006) in order to prioritise future detailed...
-
Flood ProjectFloodplain Risk Management Plan
Hawkesbury-Nepean Floodplain Management Strategy Implementation
CompletedPublication date: 01/10/2004Table of contents: The Hawkesbury-Nepean flood problem Providing effective evacuation routes Better flood forecasting and warning Improved flood emergency response...
-
Flood ProjectGuidance, Tools and Resources
Road Evacuation Route Upgrade Strategy Local Hydraulics Specification Study E...
CompletedPublication date: 06/03/2002This Study investigated the hydraulic capacity of ten (10) low points identified in the road network used for emergency flood evacuation in the Emu Plains area. The Emu Plains...
-
Flood ProjectFlood study
Flood Levels Assessment for Filling within the Floodplain of South Creek
CompletedPublication date: 01/04/1997A hydraulic assessment of flood levels in South Creek was conducted to determine the impact of filling within the ADI site floodplain. An existing Department of Land & Water...
-
Flood ProjectFlood study
Nepean River at Penrith Flood Study
CompletedPublication date: 01/04/1997The Nepean River Flood Study at Penrith was commenced in March 1995 to consolidate previous studies covering this area and establish flooding behaviour under existing floodplain...
-
Flood ProjectFlood study
Peach Tree Creek - Flood Study
CompletedPublication date: 01/09/1994The purpose of the study was to define flood behaviour in the Peach Tree Creek floodplain, which is located on the right bank of the Nepean. River between the M4 Motorway and...
-
Flood ProjectPost event flood behaviour reports
Camden, Penrith - Report on the 1867 Flood
CompletedPublication date: 01/01/1985This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...