-
Report PDFs - all volumes
How to run the Flood Investigation Brief Development Tool
CompletedPublication date: 16/09/2020Refer to this document for instructions on how to run the flood investigation brief tool -
All Other Required Data
NSW Flood Investigation Brief Development Tool Files
CompletedPublication date: 16/09/2020This tool has been developed to produce a base flood investigation brief document that will be consistent with the requirements of the NSW Government Flood Program. The tool... -
Report PDFs - all volumes
Guideline for using the flood investigation brief development tool
CompletedPublication date: 01/01/2019This document is based on the national guidance document. It is to be used in conjunction with the NSW Flood Investigation Brief Development Tool to help users make appropriate... -
Spatial flood layers (post processed layers - not direct model outputs)
Revised 2016 Design Rainfalls Investigations into the need for and derivation...
CompletedPublication date: 26/07/2018This zip files contains ascii files of the revised final Wollongong IFD data. -
Report PDFs - all volumes
Revised 2016 Design Rainfalls Investigations into the need for and derivation...
CompletedPublication date: 26/07/2018PDF report for the above project. Examines the suitability of the ARR2016 IFDs in areas with rapidly varying terrain such as Wollongong and Coffs Harbour. Recommends updated... -
Report PDFs - all volumes
Flood Data Collection, Dungog and Stroud - Flood Event 21 April 2015 - Report
CompletedPublication date: 29/05/2015Flood Data Collection, Dungog and Stroud - Flood Event 21 April 2015 - Report -
Report PDFs - all volumes
Hunter Valley Region - April 2015 Flood Data Collection (Draft) - Report
CompletedPublication date: 25/05/2015Hunter Valley Region - April 2015 Flood Data Collection -
Report PDFs - all volumes
Floodplain Risk Management Study for Silverton - Report
CompletedPublication date: 07/01/2014Complete report -
Report PDFs - all volumes
Urban Flood Damages Assessment Moree, February 2012 Flood - Report
CompletedPublication date: 01/09/2013Complete Report -
Report PDFs - all volumes
Gwydir Valley - Annual Environmental Watering Plan 2012-2013 - Report
CompletedPublication date: 01/10/2012Complete -
Report PDFs - all volumes
Hay to Maude - Flood Gaugings - March/April 2012 - Report
CompletedPublication date: 01/03/2012Report -
Report PDFs - all volumes
Lachlan River Jemalong Gap to Condobolin - Floodplain Management Plan -Report
CompletedPublication date: 01/02/2012Report and Figures -
Report PDFs - all volumes
Warrah Creek - Floodplain Management Plan - Report
CompletedPublication date: 01/02/2012Report and Figures -
Collected Data
Northern Rivers NSW - Flood Summary May 2009 - Collected Data
CompletedPublication date: 28/02/2011Collected Data (Water Level and Rainfall) -
Report PDFs - all volumes
Northern Rivers NSW - Flood Summary May 2009 - Report
CompletedPublication date: 28/02/2011Complete Report -
Report PDFs - all volumes
Gwydir Wetlands - Adaptive Environmental Management Plan - Report
CompletedPublication date: 01/02/2011Final -
Report PDFs - all volumes
Edward and Niemur Rivers Stage 3: Moama-Moulamein Railway to Liewah and Malla...
CompletedPublication date: 01/01/2011Report + Figures -
Report PDFs - all volumes
Wakool River Moama-Moulamein Railway to Gee Gee Bridge - Floodplain Managemen...
CompletedPublication date: 01/01/2011Report and Figures -
Report PDFs - all volumes
Billabong Creek - Walbundrie to Jerilderie Floodplain Management Plan - Flood...
CompletedPublication date: 01/12/2010Complete report -
Report PDFs - all volumes
Moomin Creek - Floodplain Management Plan - Report
CompletedPublication date: 01/10/2010Report and Figures