Flood ProjectLevee reports
Moree Flood Management Plan Recommendations Investigation
CompletedPublication date: 06/04/2022Dryside Engineering (DSE) in partnership with Water Modelling Solutions (WMS) were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from...
-
Flood ProjectFlood study
Moree Flood Management Plan Recommendations Investigation
CompletedPublication date: 30/07/2021Dryside Engineering in partnership with Water Modelling Solutions were engaged by Moree Plains Shire Council to undertake and investigate the recommendations from the peer...
-
Flood ProjectConcept Design
Mungindi NSW Town Levee Investigation and Concept Design
CompletedPublication date: 01/07/2021The Mungindi NSW Town Levee Investigation and Concept Design report deals with the investigation and concept design of upgrade requirements for the earthen ring levee which...
-
Flood ProjectFlood study
Pallamallawa Northern Levee Design Review
CompletedPublication date: 12/12/2018The Pallamallawa Floodplain Risk Management Study recommended that a levee be constructed around the northern side of the town to reduce the flood risk from the local catchment....
-
Flood ProjectFloodplain Risk Management Study
Review of Moree and Environs Flood Study/Floodplain RIsk Management Study...
CompletedPublication date: 31/05/2017This is Volume 2 of the Review of Moree and Environs FS/FRMS&P - which is the Floodplain RIsk Management Study . It should be viewed in conjunction with Volume 1 (Flood...
-
Flood ProjectFlood study
Review of Moree and Environs Flood Study / Floodplain Risk Management Study...
CompletedPublication date: 25/01/2017WRM Water & Environment Pty Ltd (WRM) was commissioned by Moree Plains Shire Council (MPSC) to review the Moree and Environs Flood Study/Floodplain Risk Management Study and...
-
Flood ProjectFloodplain Risk Management Plan
Boggabilla Floodplain Risk Management Plan
CompletedPublication date: 07/04/2015The general area of Boggabilla is located within the Border Rivers catchment on the Macintyre River floodplain. The town itself lies at the intersection of the Newell Highway...
-
Flood ProjectFloodplain Risk Management Plan
Mungindi Floodplain Risk Management Plan
CompletedPublication date: 07/04/2015The general area of Mungindi is located within the Border Rivers catchment on the Barwon River floodplain. The town itself lies on the Carnarvon Highway, 120 km north-west of...
-
Flood ProjectPost event flood behaviour reports
Mungindi Levee Flood Analysis
CompletedPublication date: 15/06/2009Mungindi is located on the Barwon River, on the New South Wales - Queensland border. That part of the township south of the river lies in the Moree Plains Shire Council Local...
-
Flood ProjectGuidance, Tools and Resources
Moree Plains - Flood Mapping Atlas
CompletedPublication date: 01/03/2007Atlas map showcasing the Moree Plans Local Government Area and which parts are inundated, low hazard and high hazard. Flood contours are also visible.
-
Flood ProjectFloodplain Risk Management Study
Pallamallawa Floodplain Management Study
CompletedPublication date: 04/09/2006Pallamallawa is situated on the northern bank of the Gwydir River and is subject to flooding from the river. The town is partially protected from Gwydir flooding by a levee that...
-
Flood ProjectFlood study
Flood Study for Boggabilla
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...
-
Flood ProjectFlood study
Flood Study for Boomi
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...
-
Flood ProjectFlood study
Pallamallawa Flood Study
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of the...
-
Flood ProjectFlood study
Flood Study for Mungindi
CompletedPublication date: 18/03/2004This report provides the Flood Study component of the floodplain risk management process and details the investigation of flood behaviour associated with the ‘urban’ area of...
-
Flood ProjectGuidance, Tools and Resources
Pallamallawa - 1% Design Event (Moree Flood Study)
CompletedPublication date: 01/09/2003Illustrates the peak depths (metres) of the 1% AEP Design Event in Pallamallawa.
-
Flood ProjectGuidance, Tools and Resources
Gwydir River - Biniguy to Moree - Hydraulic Modelling Study
CompletedPublication date: 01/02/2003The Biniguy to Moree Flood Study (as outlined in this report) details the investigations of flood behaviour on the Gwydir-Mehi river system between Biniguy and Moree. The Gwydir...
-
Flood ProjectVisual Levee Audits
Audit of Flood Levees for New South Wales - Town of Mungindi
CompletedPublication date: 01/05/1992The town of Mungindi on the Barwon River in New South Wales has a population of about 950. It is protected from flooding by a levee system surrounding the town. The total length...
-
Flood ProjectGuidance, Tools and Resources
Floods in the Border Rivers
CompletedPublication date: 01/01/1989Since the commencement of river level observations at Mungindi in 1886, the Border Rivers Basin has experienced floods of varying magnitudes and durations. The basin comprises a...
-
Flood ProjectGuidance, Tools and Resources
Guidelines for Floodplain Development - Gwydir River - Moree Area
CompletedPublication date: 31/12/1979This report has been prepared for issue to landholders on the flood plain of the Gwydir River and effluent streams between Carole Creek Offtake and Brageen Crossing, where...