-
Flood ProjectConcept Design
Preliminary Options and Feasibility Assessment – Flood Evacuation Route for...
CompletedPublication date: 21/06/2021This study is a preliminary options and feasibility assessment of a flood evacuation route for Central Maitland and Lorn. As part of Maitland City Council’s ambitions to expand...
-
Flood ProjectFlood study
Lochinvar Flood Study
CompletedPublication date: 31/07/2019Study objective This flood study provides information about existing flood risk in the Lochinvar Creek catchment. Study Area The Lochinvar Flood Study covers the Lochinvar Creek...
-
Flood ProjectFlood study
Wallis and Swamp Fishery Creek Flood Study
CompletedPublication date: 28/02/2019Study Area The Wallis and Swamp-Fishery Creek catchment is located in the Hunter Valley, approximately 30 km west of Newcastle, with an area of some 400 square kilometres. The...
-
Flood ProjectGuidance, Tools and Resources
The Maitland Mercury- Superstorm Survey
CompletedPublication date: 02/06/2015Newspaper Article from The Maitland Mercury: City receives 240 responses on superstorm survey.
-
Flood ProjectFlood study
Lower Hunter Valley (Oakhampton to Green Rocks) - Supplementary Flood Study
CompletedPublication date: 01/10/1998The study area was taken as the channel and floodplain downstream of Oakhampton Railway Bridge on the Hunter River, and Dunmore Bridge on the Paterson River, to Green Rocks on...
-
Flood ProjectFloodplain Risk Management Plan
Lochinvar Floodplain Risk Management Plan
CompletedPublication date: 30/09/1998The Floodplain Management Plan represents Stage 3 of the floodplain management process and provides an overall plan for better management of the floodplain. The key components...
-
Flood ProjectFloodplain Risk Management Study
Lochinvar Floodplain Management Study
CompletedPublication date: 01/05/1997Lochinvar Creek has a catchment area of 15.2 square kilometres and is a minor tributary of the Hunter River. The township of Lochinvar is located on Lochinvar Creek within the...
-
Flood ProjectGuidance, Tools and Resources
Maitland - Floodplain Modelling for the State Emergency Service (Draft)
CompletedPublication date: 01/05/1993The State Emergency Service (SES) is currently preparing a Flood Action Plan for the Maitland area. The information they are using to prepare the Plan is the Public Works...
-
Flood ProjectGuidance, Tools and Resources
Flood Control Works on the Lower Hunter River
CompletedPublication date: 15/09/1986The catchment of the Hunter River and its tributaries is 6,700 sq. miles at Maitland which is the principal city end the commercial centre for a rich rural district and the...
-
Flood ProjectGuidance, Tools and Resources
Hunter Valley - Effects of Dams on Flood - Levels at Muswellbrook, Singleton...
CompletedPublication date: 01/01/1982This report summarizes the results of studies undertaken by the Water Resources Commission of N.S.W. to assess the effects of dams on flood levels at Muswellbrook, Singleton and...
-
Flood ProjectPost event flood behaviour reports
Hunter River Valley - Hydrologic Features - Feb 1955 Flood
CompletedPublication date: 01/04/1956This report is intended to record the essential hydrographic facts and observations of the flood during February, 1955, in that section of the Hunter River Valley above its...
-
Flood ProjectFlood study
A Report on the Flood of February, 1955 in the Hunter Valley
CompletedPublication date: 01/02/1955The Hunter Valley is one of the prominent geographical features of Eastern New South Wales, standing out as a tongue of lowland penetrating deeply from the coast into the...
-
Flood ProjectGuidance, Tools and Resources
Hunter Valley - Flood Mitigation Scheme Bolwarra Floodway Investigations
CompletedPublication date: 01/01/1111The Bolwarra Floodway Investigation tested on a hydraulic model the layout of levee embankments as controls for the floodwater. The model indicated the head and tailwater levels...