10 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Mooki River Floodplain Management Plan - Environmental Assessment

    Completed
    Publication date: 26/06/2001
    The Mooki River is a tributary of the Namoi River, which is a tributary of the Barwon River, which is a tributary of the Murray/Darling River. The study area covers the right...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Blackville Floodplain Management Study Report and Plan

    Completed
    Publication date: 15/01/2001
    The Mooki River at Caroona has a total catchment area of approximately 202,400 hectares which includes 155,600 hectares in the Warrah Creek and Borambil Creek catchments. The...

  • Flood Project
    Floodplain Risk Management Study

    Gunnedah and Carroll Floodplain Management Study

    Completed
    Publication date: 01/12/1999
    Gunnedah Local Government Area (LGA) is situated in the Northern Statistical Division of NSW and has an area of 5,100 square kilometres. Gunnedah, its largest town, is located...

  • Flood Project
    Floodplain Risk Management Study

    Gunnedah Flood Plain Management Study - Assessment of Floodplain Management Measures

    Completed
    Publication date: 17/06/1999
    The various flood management measures have been the subject of an assessment against many considerations, being: impact on flood behaviour economic cost-benefit analysis visual...

  • Flood Project
    Guidance, Tools and Resources

    Guidelines for Namoi Valley Flood Plain Development - Carroll Group

    Completed
    Publication date: 01/01/1998
    The Mooki and Namoi Rivers of northern New South Wales join immediately upstream of Gunnedah. A considerable portion of the flood plain of these two rivers is utilised for...

  • Flood Project
    Floodplain Risk Management Study

    Red Bobs - Floodplain Management Study

    Completed
    Publication date: 01/08/1995
    At the recommendation of the NSW Floodplain (Non Tidal) Management Advisory Committee in its report entitled "Floodplain Management on the Liverpool Plains" (1994), the...

  • Flood Project
    Guidance, Tools and Resources

    Mooki River Catchment - Hydrogeological Investigation & Dryland Salinity...

    Completed
    Publication date: 01/03/1994
    "A joint venture between the Department of Water Resources, Soil Conservation Service (Department of Conservation and Land Management) and NSW Agriculture has led to...

  • Flood Project
    Guidance, Tools and Resources

    Upper Eastern Mooki River Catchment - Hydrogeological Investigation and...

    Completed
    Publication date: 01/02/1994
    A joint venture between the Department of Water Resources (DWR) and the Soil Conservation Service (SCS) Department of Conservation and Land Management, has led to investigations...

  • Flood Project
    Guidance, Tools and Resources

    Lake Goran - Investigation

    Completed
    Publication date: 01/02/1993
    Environmental, economic and social dilemmas within the are a bounded by the Goran Landcare Group have continued to escalate over recent years. At the centre of the problem is...

  • Flood Project
    Guidance, Tools and Resources

    Mooki River Floodplain Survey - Breeza - Report A

    Completed
    Publication date: 01/01/1111
    SURVEY METHOD The survey was carried out using a 'Trimble' Dual Frequency GPS system in Real Time Kinematic mode. This system applies corrections to the signals received from...