-
Flood ProjectFloodplain Risk Management Study
Canley Corridor Floodplain Risk Management Study
CompletedPublication date: 08/10/2015The study area is located in Fairfield City approximately 32 kilometres south west of the Sydney CBD. The Canley Corridor catchment drains in a north easterly direction to...
-
Flood ProjectFlood study
Wetherill Park Overland Flood Study
CompletedPublication date: 18/02/2015The Local Government Area of Fairfield City covers an area of around 102.5 square kilometres and is located on a number of floodplains. These floodplains comprise the low-lying...
-
Flood ProjectPost event flood behaviour reports
Review of Prospect Creek Flood Levels
CompletedPublication date: 01/06/2004The overall study area is the catchment of Prospect Creek. It comprises the catchments of Prospect Creek and its tributaries between Widemere Road, Wetherill Park and the...
-
Flood ProjectFloodplain Risk Management Study
Upper Prospect Creek - Floodplain Management Study
CompletedPublication date: 01/09/1993This report has been prepared by Willing & Partners Pty Ltd for Fairfield City Council as part of the Upper Prospect Creek Floodplain Management Study. It represents the...
-
Flood ProjectGuidance, Tools and Resources
Prospect Creek - Flood Model Investigation
CompletedPublication date: 01/03/1985"Rivers and Ports Branch of the Public commissioned Manly Laboratory to undertake a determine the effects of high order floods on Prospect Creek, a tributary of the Georges...
-
Flood ProjectFloodplain Risk Management Plan
Community Flood Education and Awareness in Fairfield City
CompletedPublication date: 01/12/2012Context Fairfield City, located in south-western Sydney, straddles parts of the Georges River and Hawkesbury-Nepean River catchments, and is home to approximately 190,000...
-
Flood ProjectFlood study
Burns Creek Flood Study
CompletedPublication date: 01/07/2011Sinclair Knight Merz (SKM), in association with Fairfield Consulting Services (FCS), was engaged by Fairfield City Council (FCC) to undertake a flood study for Burns Creek that...
-
Flood ProjectFlood study
Smithfield Overland Flood Study
CompletedPublication date: 01/05/2011The Local Government Area (LGA) of Fairfield City covers an area of around 102.5 km2 and is located on a number of floodplains. These floodplains comprise the low-lying land...
-
Flood ProjectFlood study
Old Guildford Overland Flood Study
CompletedPublication date: 04/08/2010The local government area of Fairfield City is crossed by several major creeks, all of which are prone to mainstream flooding. In addition, parts of Fairfield City are at risk...
-
Flood ProjectFloodplain Risk Management Plan
Prospect Creek Floodplain Management Plan Review
CompletedPublication date: 01/03/2010Prospect Creek is a heavily urbanised catchment situated in Sydney’s west. It is a tributary of the Georges River and includes the suburbs of Lansvale, Canley Vale, Carramar,...
-
Flood ProjectFlood study
Canley Corridor Overland Flood Study
CompletedPublication date: 01/12/2009The NSW Floodplain Development Manual (2005) states that local overland flow is a significant problem that should be considered alongside mainstream river and creek flooding....
-
Flood ProjectFlood study
Flood Study for Orphan School Creek, Green Valley and Clear Paddock Creek
CompletedPublication date: 24/10/2008FCC has undertaken a number of flood studies over the last few years including: Cabramatta Creek Flood Study Prospect Creek Flood Study Georges River (FCC section) Flood Study....
-
Flood ProjectFlood study
Prospect Creek Floodplain Management Plan
CompletedPublication date: 01/02/2006Flood Study Review Flood behaviour throughout the Prospect Creek catchment was previously documented in the Lower Prospect Creek Floodplain Management Study (Willing &...
-
Flood ProjectFlood study
Fairfield City Overland Flood Study
CompletedPublication date: 01/12/2004The NSW Floodplain Management Manual (2001) discusses the different types of local flooding problem and concludes that it is a matter of scale. At the lower end of the scale,...
-
Flood ProjectFlood study
Prospect Creek Analysis of January 2001 Flood
CompletedPublication date: 01/10/2001This report has been prepared by Cardno Willing (NSW) Pty Ltd for Fairfield City Council to investigate and report on the flood which occurred on 3lst January 2001. The flood...
-
Flood ProjectFloodplain Risk Management Study
Upper Prospect Creek Floodplain Management Study
CompletedPublication date: 01/09/1993The Upper Prospect Creek Floodplain Management Study was commissioned by Fairfield City Council in order to review flood behaviour within the Upper Prospect Creek flood plain...
-
Flood ProjectFloodplain Risk Management Study
Lower Prospect Creek Floodplain Management Study
CompletedPublication date: 01/05/1990The objectives of the Lower Prospect Creek Floodplain Management Study were to quantify the extent of flooding, investigate the feasibility of a range of floodplain management...
-
Flood ProjectFloodplain Risk Management Study
Fairfield Flood Mitigation Study
CompletedPublication date: 01/04/1985Flood prone lands in the Fairfield City Council (FCC) area are shown on two sets of maps. These are the Lower Georges River Preliminary Flood Plain Atlas issued by the Public...