41 Flood Projects found

Licenses: notspecified Organisations: Canterbury-Bankstown Council

Filter Results
  • Flood Project
    Flood study

    Morris Gully Catchment Flood Study

    Completed
    Publication date: 01/03/2011
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Morris Gully stormwater catchment, including the analysis of flows within the...

  • Flood Project
    Flood study

    Wolumba Catchment Flood Study

    Completed
    Publication date: 01/12/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Wolumba stormwater catchment, including the analysis of flows within the underground...

  • Flood Project
    Flood study

    Padstow Stormwater Catchment Flood Study

    Completed
    Publication date: 01/08/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Padstow catchment, including the analysis of flows within the underground pipe...

  • Flood Project
    Flood study

    Davies Road Stormwater Catchment Flood Study

    Completed
    Publication date: 01/08/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Davies Road catchment, including the analysis of flows within the underground pipe...

  • Flood Project
    Flood study

    Rookwood Road Catchment Flood Study Report

    Completed
    Publication date: 01/07/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Rookwood Road stormwater catchment, including the analysis of flows within the...

  • Flood Project
    Flood study

    Lucas Road Catchment Flood Study Report

    Completed
    Publication date: 01/07/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Lucas Road stormwater catchment, including the analysis of flows within the...

  • Flood Project
    Flood study

    Fairford Road Catchment Flood Study Report

    Completed
    Publication date: 01/07/2010
    Reasons for the Study The purpose of the study is to define flood behaviour throughout the Fairford Road stormwater catchment, including the analysis of flows within the...

  • Flood Project
    Flood study

    Kelso Stormwater Catchment Flood Study

    Completed
    Publication date: 01/12/2009
    Reasons for the Study The purpose of the current study is to define flood behaviour throughout the Kelso Stormwater catchment, including the analysis of surface runoff across...

  • Flood Project
    Flood study

    East Hills Stormwater Catchment Flood Study

    Completed
    Publication date: 01/12/2009
    Reasons for the Study The purpose of the current study is to define flood behaviour throughout the East Hills Stormwater catchment, including the analysis of flows within the...

  • Flood Project
    Flood study

    Greenacre Park Stormwater Catchment Flood Study

    Completed
    Publication date: 01/12/2009
    Reasons for the Study The purpose of the current study is to define flood behaviour throughout the Greenacre Park Stormwater catchment, including the analysis of surface runoff...

  • Flood Project
    Flood study

    Salt Pan Creek Stormwater Catchment Study

    Completed
    Publication date: 01/06/2007
    Reasons for the Study The purpose of the current study is to define flood behaviour throughout the Salt Pan Creek study area, including the analysis of surface runoff across the...

  • Flood Project
    Flood study

    Little Salt Pan Creek Stormwater Catchment Study

    Completed
    Publication date: 01/06/2007
    Reasons for the Study The purpose of the current study is to define flood behaviour throughout the Little Salt Pan Creek catchment, including the analysis of surface runoff...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Georges River Floodplain Risk Management Study & Plan

    Completed
    Publication date: 19/05/2004
    Reasons for the Study and Plan The Georges River is one of the most populated catchments in Australia. The river and its tributary creeks represent Sydney’s most immediate flood...

  • Flood Project
    Flood study

    Little Salt Pan Creek Flood Study

    Completed
    Publication date: 01/02/1995
    A flood study of Little Salt Pan Creek was carried out to determine design flood levels for the I% Annual Exceedance Probability (AEP), 2%AEP, 5%AEP and the Probable Maximum...

  • Flood Project
    Floodplain Risk Management Study

    Cooks River Floodplain Management Study

    Completed
    Publication date: 01/08/1994
    A Flood Study of the Cooks River was published in 1985. This defined existing flood behaviour based on technology and data available at that time. Since the Flood Study was...

  • Flood Project
    Flood study

    Salt Pan Creek Flood Study

    Completed
    Publication date: 01/06/1991
    A Flood Study of Salt Pan Creek was undertaken to determine the design levels applicable to the 5 %, 2%, I% and extreme floods. The study area was limited to the major...

  • Flood Project
    Flood study

    East Hills Floodway Model Investigation

    Completed
    Publication date: 01/10/1987
    This Report details the results of a hydraulic model investigation into flooding along the Georges River at East Hills. The investigation was undertaken by Manly Hydraulics...

  • Flood Project
    Flood study

    Rabaul Road Floodway Study

    Completed
    Publication date: 01/09/1987
    This report focuses on categorisation of the study area from a hydraulic viewpoint and preliminary determination of the hazard category on hydraulic grounds. In this regard the...

  • Flood Project
    Flood study

    Cooks River Flood Study

    Completed
    Publication date: 01/02/1985
    This study is directed to determining the one, two and five percent probability design flood levels for:- the Cooks River between Brighton Avenue, Canterbury and the Alexandra...

  • Flood Project
    Flood study

    Moorebank-Milperra Floodway Study, City of Bankstown

    Completed
    Publication date: 01/09/1983
    The catchment of the Georges River is extensive and covers almost 1000 square kilometres. Although major floods generally result from prolonged heavy rainfall in the upper part...