-
Flood ProjectFlood study
Update of Wolli Creek Pipe Drainage and Overland Flow Study
CompletedPublication date: 01/01/2008The Wolli Creek Piped Drainage and Overland Flow Analysis Draft Report of September 2001 identified that the East Hills Railway Line acted as a significant barrier to overland...
-
Flood ProjectFlood study
Northern Bardwell Creek Piped Drainage and Overland Flow Analysis
CompletedPublication date: 01/02/2003This study provides drainage analyses for 14 catchments along Bardwell Creek between Bexley Road and Hannam Street, Bardwell Park. The total catchment area analysed is 116.6...
-
Flood ProjectFlood study
Upper Muddy Creek Piped Drainage Analysis Stage 1
CompletedPublication date: 01/12/1999This study provides the piped drainage analyses of two Upper Muddy Creek sub-catchments: Sub-catchment No. 1 (Main Line), Sub-catchment No. 2 (Queen Street Branch). These...
-
Flood ProjectFlood study
Bonnie Doon Drainage Catchment Flood Study
CompletedPublication date: 28/05/1997A flood study of the Bonnie Doon Drainage Catchment was undertaken to estimate drainage system performance and flood levels for a range of design rainfall events. They were the...
-
Flood ProjectFlood study
Wolli Creek, Bardwell Creek and Bonnie Doon Channel Flood Study
CompletedPublication date: 01/11/1996The catchment area of Wolli Creek to its junction with the Cooks River is 22 square kilometres. Bardwell Creek is the major tributary of Wolli Creek, and joins it approximately...