11 Flood Projects found

Filter Results
  • Flood Project
    Floodplain Risk Management Study and Plan

    Botany Bay and Foreshore Beach Floodplain Risk Management Study and Plan

    Completed
    Publication date: 12/03/2021
    The Botany Bay and Foreshore Beach Catchment is located within the Bayside Council local government area, and includes parts of the suburbs of Botany, Pagewood and Banksmeadow....

  • Flood Project
    Flood study

    Mascot, Rosebery and Eastlakes Flood Study

    Completed
    Publication date: 20/03/2019
    The suburb of Mascot is divided by the SWSOOS (ocean outfall sewer) and bounded on the west by the Alexandra Canal. The eastern side generally falls to the south eventually...

  • Flood Project
    Flood study

    Bardwell Creek 2D Flood Study Review

    Completed
    Publication date: 01/03/2019
    Bardwell Creek is a tributary of Wolli Creek. Wolli Creek is in turn a tributary of the Cooks River with its confluence at the Tempe railway bridge crossing the Cooks River. The...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Mascot, Roseberry and Eastlakes Floodplain Risk Management Study & Plan

    Completed
    Publication date: 20/12/2018
    Introduction Royal HaskoningDHV (RHDHV) has been commissioned to prepare the Mascot, Rosebery and Eastlakes (MRE) Floodplain Risk Management Study and Plan (FRMS&P) on...

  • Flood Project
    Flood study

    Bonnie Doon, Eve Street/Cahill Park Pipe & Overland 2D Flood Study

    Completed
    Publication date: 27/02/2017
    The catchment is heavily urbanised with medium density residential developments in the upper catchment, and higher density residential, light industrial and commercial...

  • Flood Project
    Flood study

    Spring Street Drain, Muddy Creek and Scarborough Ponds Catchment Flood Study Review

    Completed
    Publication date: 13/02/2017
    The study area is bounded by the Cooks River to the north, Forest Road to the west and Ramsgate Road to the south. The catchment land use is primarily medium to high-density...

  • Flood Project
    Flood study

    Botany Bay Foreshore Beach Catchment Flood Study

    Completed
    Publication date: 15/12/2015
    The catchment area is approximately 3.5 km2. The eastern side of the catchment drains to Sir Joseph Banks Park and the western side drains to Mill Stream in the west, before...

  • Flood Project
    Flood study

    Sans Souci Flood Study Review

    Completed
    Publication date: 14/09/2015
    The northern extent is Ramsgate Road and includes the uppermost part of the Scarborough Ponds catchment. The catchment is drained by three distinct channels flowing south and...

  • Flood Project
    Flood study

    Sans Souci Flood Study

    Completed
    Publication date: 14/09/2015
    The study area is bounded by Rocky Point Road in the west which is a localised high point and Rockdale City Council boundary. The northern extent of the study area is formed by...

  • Flood Project
    Flood study

    Springvale Drain and Floodvale Drain Flood Study

    Completed
    Publication date: 21/01/2014
    The catchment is heavily urbanised and is predominantly comprised of industrial development with a large proportion of residential development in the upper catchment. The...

  • Flood Project
    Flood study

    Bonnie Doon Drainage Catchment Flood Study (Pipe and Overland 2D)

    Completed
    Publication date: 28/05/1997
    The Bonnie Doon Drainage Catchment is located within the Rockdale City Council Local Government area and drains the suburb of Arncliffe to the Cooks River. The catchment area...