2 Flood Projects found

Tags: Deadmans Creek None: notspecified

Filter Results
  • Flood Project
    Flood study

    Newrybar Swamp Drainage and Flood Mitigation Study

    Completed
    Publication date: 16/06/2015
    Newrybar Swamp is a low lying parcel of land forming most of the northern half of the North Creek catchment, which drains to the Richmond River at Ballina. Newrybar Swamp is...

  • Flood Project
    Flood study

    Ballina Flood Study Update

    Completed
    Publication date: 01/03/2008
    This study includes consideration of the plateau catchments and flooding behaviour of Emigrant Creek, Maguires Creek, North Creek and the lower Richmond River. These catchments...