-
Flood ProjectFloodplain Risk Management Study and Plan
Bundeena Creek Floodplain Risk Management Study & Plan 2019
CompletedPublication date: 13/08/2019Bundeena is located on the southern shores of Port Hacking situated within the Sutherland Shire Council LGA. Bundeena has a history of flooding, both mainstream from Bundeena...
-
Flood ProjectFloodplain Risk Management Study and Plan
Gwawley Bay Catchment Floodplain Risk Management Study and Plan (Draft)
CompletedPublication date: 01/03/2015The study area is the catchment that drains to Gwawley Bay, at Sylvania Waters. Gwawley Bay is located on the south side of the Georges River, between Captain Cook Bridge and...
-
Flood ProjectFlood study
Revised Oyster Creek Flood Study
CompletedPublication date: 09/09/2010The study area for this Revised Oyster Creek Flood Study was taken as the reach of floodplain extending from approximately 170 m upstream of the Box Road footbridge down to...
-
Flood ProjectFloodplain Risk Management Plan
Oyster Creek Floodplain Risk Management Plan
CompletedPublication date: 08/06/2005Oyster Creek has a catchment area of some 2.4 square kilometres upstream of Bates Drive and 3.5 square kilometres to the Georges River. The catchment is steep and includes the...
-
Flood ProjectFloodplain Risk Management Study
Oyster Creek Floodplain Risk Management Study
CompletedPublication date: 01/06/2005Oyster Creek has a catchment area of some 2.4 square kilometres upstream of Bates Drive and 3.5 square kilometres to the Georges River. The catchment is steep and includes the...
-
Flood ProjectFlood study
Oyster Creek Flood Study (Draft)
CompletedPublication date: 15/02/2005Oyster Creek has a catchment area of some 2.4 square kilometres upstream of Bates Drive and 3.5 square kilometres to the Georges River. The catchment is steep and includes the...
-
Flood ProjectFlood study
Bundeena Creek Flood Study 2014
SupersededPublication date: 25/08/2014The 2014 Bundeena Creek Flood Study assessed mainstream flooding in low lying areas of Bundeena Creek. Approximately 270 properties were identified as flood affected in the...
-
Flood ProjectFlood study
Gwawley Bay Catchment Flood Study
CompletedPublication date: 01/11/2012Reasons for the Study Significant flooding problems were reported within the Gwawley Bay catchment from a storm that occurred on 13th May 2003. A number of houses, factories and...
-
Flood ProjectFlood study
Kurnell Township Flood Study
CompletedPublication date: 09/05/2009Kurnell is susceptible to flooding from both rainfall and tidal inundation. Kurnell’s low lying topography and localised depressions can make it vulnerable to extensive...
-
Flood ProjectFlood study
Oyster Creek Flood Study
CompletedPublication date: 01/06/2005This report was prepared by Webb, McKeown & Associates on behalf of Sutherland Shire Council and details the hydrologic and hydraulic investigations carried out to determine...
-
Flood ProjectPost event flood behaviour reports
Sutherland Shire Council - Initial Subjective Assessment of Major Flooding 2004
CompletedPublication date: 01/03/2004Reasons for the Study Flooding across Sutherland Shire led to serious damages on 13 May 2003. Acknowledging the problems of local overland flooding, and in keeping with the...
-
Flood ProjectFlood study
Deadman's Creek Flood Study
CompletedPublication date: 01/02/1997The Deadman's Creek catchment rises to the north of Woronora Reservoir at a maximum elevation of about 200m above sea level (see Figure 1). The creek flows in a northerly...
-
Flood ProjectFloodplain Risk Management Plan
Woronora River Floodplain Management Plan
CompletedPublication date: 01/09/1995Sutherland Shire Council, through its Floodplain Management Committee, is developing a Floodplain Management Strategy for the Woronora River floodplain in accordance with the...
-
Flood ProjectFloodplain Risk Management Study
Woronora River Floodplain Management Study
CompletedPublication date: 01/09/1995Sutherland Shire Council, through its Floodplain Management Committee, is developing a Floodplain Management Strategy for the Woronora River floodplain. The objective of this...
-
Flood ProjectFlood study
Bundeena Flood Management Study
CompletedPublication date: 01/08/1993Bundeena is a township of just over 2,000 people located on the southern shore of Port Hacking in Sydney's south. The township is located within the Sutherland Shire Council...
-
Flood ProjectFlood study
Woronora River Flood Study
CompletedPublication date: 01/08/1991A flood study of the Woronora River was undertaken to determine the design flood levels for the 1%, 2% and 5% AEP events, as well as the levels for an extreme flood event. The...