48 Flood Projects found

Filter Results
  • Flood Project
    Flood study

    Allans Creek Flood Study

    Completed
    Publication date: 11/12/2019
    The Allans Creek catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council engaged Advisian (part...

  • Flood Project
    Flood study

    TOWRADGI CREEK FLOOD STUDY December 2019 report

    Completed
    Publication date: 01/12/2019
    TOWRADGI CREEK FLOOD STUDY December 2019 report

  • Flood Project
    Flood study

    Minnegang Creek Flood Study

    Completed
    Publication date: 23/10/2019
    The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...

  • Flood Project
    Flood study

    Kully Bay Overland Flow Study

    Completed
    Publication date: 23/10/2019
    The Kully Bay catchment is located in the suburb of Warrawong, in the Wollongong City LGA. The catchment covers an area of approximately 150 hectares and extends from the...

  • Flood Project
    Flood study

    Collins Creek Flood Study

    Completed
    Publication date: 27/09/2019
    A study to better define flooding and drainage behaviour for study conducted in 2011 in Woonona. A key objective of the study was to assess the impacts of an updated blockage...

  • Flood Project
    Flood study

    Wollongong City Flood Study (2019)

    Completed
    Publication date: 19/08/2019
    A review of the Wollongong City Flood study has been conducted on behalf of Wollongong City Council (“Council”) for the Wollongong City study area. The purpose of this review...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 31/05/2019
    The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...

  • Flood Project
    Flood study

    Review of the Brooks Creek Flood Study

    Completed
    Publication date: 30/04/2018
    EXECUTIVE SUMMARY Study Objective SMEC Australia Pty Ltd (SMEC) was commissioned by Wollongong City Council (WCC) to undertake a review of the 2010 Brooks Creek Flood Study...

  • Flood Project
    Flood study

    Mullet Creek Flood Model Update

    Completed
    Publication date: 13/04/2018
    Summary The model update of Mullet Creek has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Mullet Creek. The model update was...

  • Flood Project
    Concept Design

    Debris Control Structures for Allans Creek, Wollongong - Investigation and Co...

    Completed
    Publication date: 13/11/2017
    Allans Creek is a partly developed catchment within the Wollongong City Council Local Government Area. The catchment has an area of 42 square kilometres and is located to the...

  • Flood Project
    Guidance, Tools and Resources

    Lowering of Gurungaty Causeway Concept Design Report

    Completed
    Publication date: 02/08/2017
    The Gurungaty Waterway is located 3.5km north of Port Kembla and flows from north to south into Tom Thumb Lagoon. The catchment area for this waterway is approximately 7.3...

  • Flood Project
    Concept Design

    Debris Control Screens for Whartons Creek, Farrahars Creek and Bellambi Gully...

    Completed
    Publication date: 22/06/2017
    Wollongong City Council (Council) has commissioned Royal HaskoningDHV (RHDHV) to investigate and develop concept designs and an economic business case for four (4) Debris...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Wollongong City (Gurungaty Waterway) Catchment Floodplain Risk Management Stu...

    Completed
    Publication date: 01/11/2015
    EXECUTIVE SUMMARY Overview This report presents outcomes of a Flood Risk Management Study (FRMS) and Plan (FRMP) for the Gurungaty Waterway catchment (the study area is shown in...

  • Flood Project
    Flood study

    Review of Towradgi Creek Flood Study

    Completed
    Publication date: 11/02/2015
    EXECUTIVE SUMMARY Introduction The review of Towradgi Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in...

  • Flood Project
    Flood study

    Review of Towradgi Creek Flood Study

    Completed
    Publication date: 01/02/2015
    Overview Final report for the Review of Towradgi Creek Flood Study. The report covers the data collection process, community consultation, development of computer models,...

  • Flood Project
    Detailed Design

    Brandy & Water Creek- Investigation & Design of Creek Modification

    Completed
    Publication date: 01/05/2014
    Introduction Cardno undertook a Floodplain Risk Management Study and Plan (FRMSP) for the Allans Creek catchment in 2006 on behalf of Wollongong City Council (Council). The...

  • Flood Project
    Detailed Design

    Brandy & Water Creek Bridge Investigation & Design of Creek Modification

    Completed
    Publication date: 01/05/2014
    One of the flooding areas identified by the Allans Creek FRMSP is along Brandy and Water Creek in the vicinity of the Darragh Drive, Figtree. This FRMSP identified a number of...

  • Flood Project
    Flood study

    Wollongong City Flood Study

    Completed
    Publication date: 01/04/2013
    Contains Volume 1 - Main Report and Volume 2 - Maps. Contains data relating to Flood Extents, Flood Hazard Zones, Flood Risk Precincts and Hydraulic Categorisation. Files...

  • Flood Project
    Flood study

    Duck Creek Flood Study

    Completed
    Publication date: 15/02/2012
    EXECUTIVE SUMMARY Introduction The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek...

  • Flood Project
    Floodplain Risk Management Plan

    Lake Illawarra Floodplain Risk Management Plan

    Completed
    Publication date: 01/01/2012
    Lake Illawarra is a shallow coastal lagoon located on the undulating coastal plain between the ocean and the cliffs of the Illawarra Escarpment. The Lake catchment of...