Flood ProjectFlood study
Allans Creek Flood Study
CompletedPublication date: 11/12/2019The Allans Creek catchment is located within the Wollongong City Council Local Government Area (LGA) in the Illawarra Region of New South Wales. Council engaged Advisian (part...
-
Flood ProjectFlood study
TOWRADGI CREEK FLOOD STUDY December 2019 report
CompletedPublication date: 01/12/2019TOWRADGI CREEK FLOOD STUDY December 2019 report
-
Flood ProjectFlood study
Minnegang Creek Flood Study
CompletedPublication date: 23/10/2019The Minnegang Creek Catchment is located approximately 7km south of Wollongong. The Minnegang Creek Catchment is approximately 90 hectares in size and is largely developed and...
-
Flood ProjectFlood study
Kully Bay Overland Flow Study
CompletedPublication date: 23/10/2019The Kully Bay catchment is located in the suburb of Warrawong, in the Wollongong City LGA. The catchment covers an area of approximately 150 hectares and extends from the...
-
Flood ProjectFlood study
Collins Creek Flood Study
CompletedPublication date: 27/09/2019A study to better define flooding and drainage behaviour for study conducted in 2011 in Woonona. A key objective of the study was to assess the impacts of an updated blockage...
-
Flood ProjectFlood study
Wollongong City Flood Study (2019)
CompletedPublication date: 19/08/2019A review of the Wollongong City Flood study has been conducted on behalf of Wollongong City Council (“Council”) for the Wollongong City study area. The purpose of this review...
-
Flood ProjectFlood study
Duck Creek Flood Study
CompletedPublication date: 31/05/2019The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek catchment and establish the basis for...
-
Flood ProjectFlood study
Review of the Brooks Creek Flood Study
CompletedPublication date: 30/04/2018EXECUTIVE SUMMARY Study Objective SMEC Australia Pty Ltd (SMEC) was commissioned by Wollongong City Council (WCC) to undertake a review of the 2010 Brooks Creek Flood Study...
-
Flood ProjectFlood study
Mullet Creek Flood Model Update
CompletedPublication date: 13/04/2018Summary The model update of Mullet Creek has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Mullet Creek. The model update was...
-
Flood ProjectConcept Design
Debris Control Structures for Allans Creek, Wollongong - Investigation and Co...
CompletedPublication date: 13/11/2017Allans Creek is a partly developed catchment within the Wollongong City Council Local Government Area. The catchment has an area of 42 square kilometres and is located to the...
-
Flood ProjectGuidance, Tools and Resources
Lowering of Gurungaty Causeway Concept Design Report
CompletedPublication date: 02/08/2017The Gurungaty Waterway is located 3.5km north of Port Kembla and flows from north to south into Tom Thumb Lagoon. The catchment area for this waterway is approximately 7.3...
-
Flood ProjectConcept Design
Debris Control Screens for Whartons Creek, Farrahars Creek and Bellambi Gully...
CompletedPublication date: 22/06/2017Wollongong City Council (Council) has commissioned Royal HaskoningDHV (RHDHV) to investigate and develop concept designs and an economic business case for four (4) Debris...
-
Flood ProjectFloodplain Risk Management Study and Plan
Wollongong City (Gurungaty Waterway) Catchment Floodplain Risk Management Stu...
CompletedPublication date: 01/11/2015EXECUTIVE SUMMARY Overview This report presents outcomes of a Flood Risk Management Study (FRMS) and Plan (FRMP) for the Gurungaty Waterway catchment (the study area is shown in...
-
Flood ProjectFlood study
Review of Towradgi Creek Flood Study
CompletedPublication date: 11/02/2015EXECUTIVE SUMMARY Introduction The review of Towradgi Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in...
-
Flood ProjectFlood study
Review of Towradgi Creek Flood Study
CompletedPublication date: 01/02/2015Overview Final report for the Review of Towradgi Creek Flood Study. The report covers the data collection process, community consultation, development of computer models,...
-
Flood ProjectDetailed Design
Brandy & Water Creek- Investigation & Design of Creek Modification
CompletedPublication date: 01/05/2014Introduction Cardno undertook a Floodplain Risk Management Study and Plan (FRMSP) for the Allans Creek catchment in 2006 on behalf of Wollongong City Council (Council). The...
-
Flood ProjectDetailed Design
Brandy & Water Creek Bridge Investigation & Design of Creek Modification
CompletedPublication date: 01/05/2014One of the flooding areas identified by the Allans Creek FRMSP is along Brandy and Water Creek in the vicinity of the Darragh Drive, Figtree. This FRMSP identified a number of...
-
Flood ProjectFlood study
Wollongong City Flood Study
CompletedPublication date: 01/04/2013Contains Volume 1 - Main Report and Volume 2 - Maps. Contains data relating to Flood Extents, Flood Hazard Zones, Flood Risk Precincts and Hydraulic Categorisation. Files...
-
Flood ProjectFlood study
Duck Creek Flood Study
CompletedPublication date: 15/02/2012EXECUTIVE SUMMARY Introduction The Duck Creek Flood Study has been prepared for Wollongong City Council (Council) to define the existing flood behaviour in the Duck Creek...
-
Flood ProjectFloodplain Risk Management Plan
Lake Illawarra Floodplain Risk Management Plan
CompletedPublication date: 01/01/2012Lake Illawarra is a shallow coastal lagoon located on the undulating coastal plain between the ocean and the cliffs of the Illawarra Escarpment. The Lake catchment of...