Concept Design

Sutton Stormwater Network Upgrade Scheme Concept Design Report

This report sets out the findings of an investigation that was undertaken into the feasibility of implementing the detention basin scheme that forms part of the Sutton Floodplain Risk Management Plan , as well as five other alternative schemes which are aimed at maximising the flood mitigation benefits to the affected community while taking account of existing constraints.

This report also provides details in the form of a concept design of an alternative piped drainage scheme that was found to provide greater flood mitigation benefits and have less impact on the community than the Detention Basins Scheme that was proposed as part of the Sutton Floodplain Risk Management Plan.

Additional Information

Field Value
Title Sutton Stormwater Network Upgrade Scheme Concept Design Report
River Basin 410 - Murrumbidgee
Commission Date 1 March 2019
Publication Date 1 March 2020
Themes Land and Resource Management
Spatial Extent
© OpenStreetMap contributors
Council/LGA Yass Valley Council
Author/ Prepared by Lyall & Associates Consulting Water Engineers
Publish date 4 May 2020
Update date 4 May 2020
Place Name Sutton
Approval State Approved
Submitted for approval 4 May 2020
Submitted by Tom Rooney
Approved 5 May 2020
Approved by dstazic
Identifier 24ad85a2-99fd-41b9-99db-e65c9653add7