Detailed Design

St Marys Flood Protection Levee Upgrade – Investigation and Detail Design

This project is to undertake detailed investigations including detailed survey of the levee, a complete auditing of the levee to identify any structural defects including soil tests required, prepare the concept and detailed design plans for the construction of the upgrade works. As part of the design it will be required to undertake detailed investigations including hydraulic modelling and prepare the concept and detailed design plans to install a suitable flood gate to Byrnes Creek culvert (i.e. downstream of the levee).

Additional Information

Field Value
Title St Marys Flood Protection Levee Upgrade – Investigation and Detail Design
River Basin 212 - Hawkesbury
Commission Date 1 March 2021
Publication Date 31 December 2024
Themes Land and Resource Management
Spatial Extent
© OpenStreetMap contributors
Council/LGA Penrith City Council
Additional LGA's covered within study
  • Penrith City Council
Author/ Prepared by Royal HaskoningDHV (RHDHV) and Penrith Council
Publish date 3 March 2025
Update date 3 March 2025
Place Name St Marys
Approval State Approved
Submitted for approval 4 March 2025
Submitted by Elias Ishak
Approved 15 March 2025
Approved by ses-sysadmin
Data Comment

Design reports in pdf Design drawings in pdf TUFLOW design flood modelling Design costing in pdf and excel