Blackmans Swamp Creek and Ploughmans Creek Flood Risk Management Study and Plan

Study Objectives

Orange City Council (Council) commissioned the preparation of the Blackmans Swamp Creek and Ploughmans Creek Flood Study (Flood Study) and the Blackmans Swamp Creek and Ploughmans Creek Floodplain Risk Management Study and Plan (FRMS&P).

The objective of the Flood Study was to define the nature of both main stream flooding and major overland flow at Orange for flood frequencies ranging between 20 and 0.2 per cent Annual Exceedance Probability (AEP), as well as for the Probable Maximum Flood (PMF). The Flood Study is the source of present day flooding conditions and was used as the basis for preparing the FRMS&P.

The objectives of the FRMS&P were to assess the impacts of flooding in Orange, review the measures that were recommended in 2009 FRMS&P along with Council’s current policies as they relate to development of land in flood liable areas, consider measures for the management of flood affected land and to develop a contemporary Floodplain Risk Management Plan for Orange which:

  1. Proposes modifications to existing Council policies to ensure that the development of flood affected land is undertaken so as to be compatible with the flood hazard and risk.

  2. Sets out the recommended program of works and measures aimed at reducing over time, the social, environmental and economic impacts of flooding.

  3. Provides a program for implementation of the proposed works and measures.

Additional Information

Field Value
Title Blackmans Swamp Creek and Ploughmans Creek Flood Risk Management Study and Plan
Commission Date 1 December 2017
Publication Date 1 December 2020
Themes Land and Resource Management
Spatial Extent
Map data © OpenStreetMap contributors
Council/LGA Orange City Council
Author/ Prepared by Lyall & Associates Consulting Water Engineers
Publish date 11 February 2021
Update date 1 March 2021
River Basin 421 - Macquarie-Bogan
Place Name Orange
Approval State Approved
Submitted for approval 26 February 2021
Submitted by Tom Rooney
Approved 2 March 2021
Approved by dstazic
Identifier d905f601-97fe-48ba-973a-a10d8966cdfc