Flood ProjectFlood study
South Albury Levee Upgrade - Murray River Flood Study
CompletedPublication date: 24/06/2024This report details flood modelling and mapping of the Murray River at Albury, carried out as part of the South Albury Levee Upgrade project. This included review and update of...
-
Flood ProjectGuidance, Tools and Resources
Levee Owners Guideline for NSW Flood Levee Systems
CompletedPublication date: 01/12/2020This guideline is intended for use by those responsible for maintaining, monitoring and operating levees in NSW (levee owners). It provides information of a general nature on...
-
Flood ProjectFloodplain Risk Management Study and Plan
Wee Waa Levee Risk Management Study & Plan
CompletedPublication date: 01/12/2019Study Objectives Narrabri Shire Council commissioned the Levee Risk Management Study and Plan for the township of Wee Waa. The overall objectives of the Levee Risk Management...
-
Flood ProjectFloodplain Risk Management Study and Plan
Murwillumbah CBD Levee & Drainage Study
CompletedPublication date: 22/08/2018A study to better define flooding and drainage behaviour within the CBD associated with local catchment runoff as well as levee overtopping. A key objective of the study was to...
-
Flood ProjectVisual Levee Audits
Muswellbrook Levee - Visual Audit of Urban Levees - Non Tidal Areas of NSW
CompletedPublication date: 01/04/2006The Dams and Civil Unit of the Department of Commerce has been engaged by the Department of Natural Resources to carry out a visual audit for a number of individual flood levees...
-
Flood ProjectVisual Levee Audits
Muswellbrook Levee - Audit of Urban Levees Non-Tidal Areas of NSW
CompletedPublication date: 01/11/2005Muswellbrook is located in the Hunter Valley, approximately 280 km north of Sydney. The town is located on the Hunter River and is protected from flooding by a levee system...
-
Flood ProjectVisual Levee Audits
Terara Levee - Final Design Report
CompletedPublication date: 01/03/2005In the mid-1970s, a levee was built along the southern bank of the Shoalhaven River from Nowra Bridge to Terara village. Following floods in the 1970s, the height of the Terara...
-
Flood ProjectFlood study
Shoalhaven City Council - Terara Levee Audit
CompletedPublication date: 02/10/2001Sinclair Knight Merz was commissioned by Shoalhaven City Council to carry out an audit of Terara Levee. The study was required to cover the following areas: Survey of the top of...
-
Flood ProjectReview of Environmental Factors
Tamworth - City Levee Upgrade - Review of Environmental Factors
CompletedPublication date: 01/01/1995Tamworth City Council proposes to upgrade its City Levee. These works follow from the recommendations of the "Floodplain Management Plan" for the City of Tamworth and Council's...