-
Flood ProjectFlood study
South Creek Flood Study
CompletedPublication date: 01/08/2010The South Creek Flood Study has been undertaken to define the nature and extent of flooding in the South Creek Catchment for a range of design events. The 466 hectare catchment...
-
Flood ProjectFlood study
Flood Levels Assessment for Filling within the Floodplain of South Creek
CompletedPublication date: 01/04/1997A hydraulic assessment of flood levels in South Creek was conducted to determine the impact of filling within the ADI site floodplain. An existing Department of Land & Water...
-
Flood ProjectFlood study
South Creek Flood Study
CompletedPublication date: 01/05/2006The NSW Government's Flood Policy provides for: a framework to ensure the sustainable use of floodplain environments, solutions to flooding problems, a means of ensuring new...
-
Flood ProjectFlood study
South Creek Flood Study
CompletedPublication date: 01/04/2005The NSW Government’s Flood Policy provides for: a framework to ensure the sustainable use of floodplain environments, solutions to flooding problems, a means of ensuring new...