-
Flood ProjectFlood study
Flood Levels Assessment for Filling within the Floodplain of South Creek
CompletedPublication date: 01/04/1997A hydraulic assessment of flood levels in South Creek was conducted to determine the impact of filling within the ADI site floodplain. An existing Department of Land & Water...
-
Flood ProjectFlood study
Nepean River at Penrith Flood Study
CompletedPublication date: 01/04/1997The Nepean River Flood Study at Penrith was commenced in March 1995 to consolidate previous studies covering this area and establish flooding behaviour under existing floodplain...
-
Flood ProjectFlood study
Peach Tree Creek - Flood Study
CompletedPublication date: 01/09/1994The purpose of the study was to define flood behaviour in the Peach Tree Creek floodplain, which is located on the right bank of the Nepean. River between the M4 Motorway and...