Skip to content
SES - NSW State Emergency Service NSW Government - Office of Environment and Heritage

NSW Flood Data Portal

breadcrumb banner

192 Flood Projects found

Tags: flood study

Filter Results
  • Flood Project
    Flood study

    Powells Creek Flood Study

    Completed
    Publication date: 03/09/2019
    BACKGROUND Powells Creek is a small southern tributary of the Parramatta River and Saleyards Creek is the major tributary of Powells Creek (Figure 1). The total catchment area...

  • Flood Project
    Flood study

    Wollongong City Flood Study (2019)

    Completed
    Publication date: 19/08/2019
    A review of the Wollongong City Flood study has been conducted on behalf of Wollongong City Council (“Council”) for the Wollongong City study area. The purpose of this review...

  • Flood Project
    Flood study

    Pallamallawa Northern Levee Design Review

    Completed
    Publication date: 12/12/2018
    The Pallamallawa Floodplain Risk Management Study recommended that a levee be constructed around the northern side of the town to reduce the flood risk from the local catchment....

  • Flood Project
    Flood study

    Nepean River Flood Study

    Completed
    Publication date: 12/11/2018
    The Hawkesbury-Nepean River catchment is one of the largest coastal basins in NSW with an area of 21,400 square kilometres. The catchment at Penrith is 52% of the total area and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Dungog Floodplain Risk Management Study and Plan

    Completed
    Publication date: 11/10/2017
    EXECUTIVE SUMMARY Introduction Dungog is located in the Upper Hunter Region of New South Wales, approximately 60 km north of Newcastle and 70 km inland from the coastline at...

  • Flood Project
    Flood study

    Boorowa Flood Study

    Completed
    Publication date: 01/03/2017
    The study objective was to define the nature of both main stream flooding and major overland flow at Boorowa for flood frequencies ranging between 20 and 0.2 per cent Annual...

  • Flood Project
    Flood study

    North Sydney LGA Flood Study

    Completed
    Publication date: 09/02/2017
    The study investigates local overland flooding and mainstream flooding to determine the nature and extent of the flood hazard. The study area is Council’s 10.9 km2 LGA and this...

  • Flood Project
    Flood study

    Wollondilly and Mulwaree Rivers Flood Study

    Completed
    Publication date: 06/10/2016
    This Study has been prepared by WMAwater on behalf of the Goulburn Mulwaree Council (Council). The main objective of this study is to define mainstream flood behaviour at...

  • Flood Project
    Flood study

    Gloucester and Avon River Flood Study

    Completed
    Publication date: 01/04/2015
    The Gloucester and Avon Rivers Flood Study has been prepared for Gloucester Shire Council (Council) to define the existing flood behaviour in the catchment and establish the...

  • Flood Project
    Flood study

    Dobroyd Canal Flood Study

    Completed
    Publication date: 01/10/2014
    BACKGROUND The Dobroyd Canal catchment is located in Sydney’s Inner West region, approximately 10 km from the CBD. The catchment includes the suburbs of Ashbury, Ashfield,...

  • Flood Project
    Flood study

    Ourimbah Creek Catchment Flood Study

    Completed
    Publication date: 31/10/2013
    Catchment Description The Ourimbah Creek catchment is located on the Central Coast of New South Wales and occupies a total area of 160 km2. The headwaters of the Ourimbah Creek...

  • Flood Project
    Flood study

    Jewells Wetland Flood Study

    Completed
    Publication date: 01/09/2013
    The Jewells Wetland Flood Study has been prepared for Lake Macquarie City Council (Council) to define the existing flood behaviour in the Jewells Wetland catchment and establish...

  • Flood Project
    Flood study

    Review of the Narara Creek Flood Study

    Completed
    Publication date: 15/06/2012
    Report outlines the Narara Creek catchment in Gosford review to update last 15 years of data, and review recent historical events of February 1990, February 1992 and June 2007

  • Flood Project
    Flood study

    Lake Macquarie Waterway - Flood Study 2012

    Completed
    Publication date: 01/06/2012
    The catchment area of the Lake Macquarie waterway to the Pacific Ocean is approximately 700 square kilometres, of which approximately 95% is within the City of Lake Macquarie....

  • Flood Project
    Flood study

    Glenbrook - Erskine Creek Catchment Flood Study

    Completed
    Publication date: 03/04/2012
    Study Objective In June 2010, Blue Mountains City Council engaged SMEC Australia Pty Ltd to undertake a flood study for the developed area subject to flood affectation within...

  • Flood Project
    Flood study

    Gulgong Stormwater Drainage Study

    Completed
    Publication date: 01/06/2009
    The urban area of Gulgong comprises two stormwater catchments which have been denoted Catchments X and Y for the purposes of this study (Figure 1.1). The catchments are...

  • Flood Project
    Flood study

    Whites Creek - Flood Study

    Completed
    Publication date: 28/10/2008
    In September 2006, Wingecarribee Shire Council engaged URS Australia Pty Ltd to undertake a Flood Study of the Whites Creek catchment within the town of Moss Vale, NSW. The...

  • Flood Project
    Flood study

    Mudflat Creek Flood Study

    Completed
    Publication date: 01/12/2006
    The Mudflat Creek Flood Study has been initiated as a result of flooding of local roads and residential areas, most recently in July 1988, January 1989, February 1990, February...

  • Flood Project
    Flood study

    Narromine Flood Study - Final Report

    Completed
    Publication date: 20/10/2006
    A Floodplain Risk Management Study (FRMS) is being prepared for Narromine as part of a Government program to mitigate the impacts of major floods and reduce the hazards in the...

  • Flood Project
    Flood study

    Geurie Flood Study

    Completed
    Publication date: 16/10/2006
    This report was prepared by Webb McKeown and Associates on behalf of Wellington Council and details the engineering investigations carried out to determine flood levels, flows...