-
Flood ProjectFloodplain Risk Management Study and Plan
Wyong River Catchment Floodplain Risk Management Study & Plan
CompletedPublication date: 20/01/2020The Wyong River catchment is located on the Central Coast of New South Wales and occupies a total area of 440 km2. The catchment is drained by a network of rivers and creeks...
-
Flood ProjectFloodplain Risk Management Study and Plan
Tuggerah Lakes Floodplain Risk Management Study and Plan
CompletedPublication date: 21/11/2014The Tuggerah Lakes system comprises of Tuggerah Lake, Budgewoi Lake and lake Munmorah and the immediate floodplain. The lakes occupy and area of approximately 80 square...
-
Flood ProjectFlood study
Wyong River Catchment Flood Study
CompletedPublication date: 13/10/2014Study Objective The primary objective of the Flood Study is to define the flood behavior within the Wyong River catchment through the establishment of appropriate numerical...
-
Flood ProjectFlood study
Upper Wyong River Flood Study
CompletedPublication date: 01/02/1988A flood study of the Upper Wyong River was undertaken to determine the design levels applicable to the 5%, 2% and 1% probability floods and an extreme flood. The lower limit of...
-
Flood ProjectFlood study
Flood Study for Proposed Wyong River Weirs
CompletedPublication date: 01/05/1985Backwater profile computations were carried out for the Wyong River as part of a preliminary study into the hydraulic effects of the proposed Upper Wyong Weir and the...