Flood ProjectFlood study
Wollondilly and Mulwaree Rivers Flood Study
CompletedPublication date: 06/10/2016This Study has been prepared by WMAwater on behalf of the Goulburn Mulwaree Council (Council). The main objective of this study is to define mainstream flood behaviour at...
-
Flood ProjectFlood study
The Village of Taralga Flood Study
CompletedPublication date: 01/02/2014Taralga has a population of about 350 and is located on Corroboree Creek which flows in a north-easterly direction through the village area. It drains a small tributary...
-
Flood ProjectFlood study
Warragamba Flood Study - Hydrologic Modelling of The Hawkesbury/Nepean Catchment
CompletedPublication date: 01/06/1989As a result of increases in estimates of Probable Maximum Precipitation (PMP) over the past 40 years it is now apparent that Warragamba Dam is unsafe; even after the current...