5 Flood Projects found

Tags: Warrah Creek

Filter Results
  • Flood Project
    Floodplain Risk Management Plan

    Warrah Creek - Floodplain Management Plan

    Completed
    Publication date: 01/02/2012
    The FMP was developed on the basis of a detailed technical analysis of flood flow and in accordance with the NSW Government’s Floodplain Development Manual (2005). The FMP is...

  • Flood Project
    Flood study

    Warrah Creek Flood Study

    Completed
    Publication date: 29/06/2005
    The Warrah Creek catchment area consists of about 1,500 square kilometres within the Upper Mooki River catchment. The study area comprises the designated floodplain areas of...

  • Flood Project
    Floodplain Risk Management Study

    Warrah Creek/Pump Station Creek Floodplain Management Study

    Completed
    Publication date: 01/03/2002
    The Warrah Creek / Pump Station Creek study area is within the Liverpool Plains Catchment and is comprised of three sub-catchment areas: Pump Station Creek; Big Jacks Creek; and...

  • Flood Project
    Floodplain Risk Management Study and Plan

    Blackville Floodplain Management Study Report and Plan

    Completed
    Publication date: 15/01/2001
    The Mooki River at Caroona has a total catchment area of approximately 202,400 hectares which includes 155,600 hectares in the Warrah Creek and Borambil Creek catchments. The...

  • Flood Project
    Guidance, Tools and Resources

    Upper Eastern Mooki River Catchment - Hydrogeological Investigation and...

    Completed
    Publication date: 01/02/1994
    A joint venture between the Department of Water Resources (DWR) and the Soil Conservation Service (SCS) Department of Conservation and Land Management, has led to investigations...