-
Flood ProjectPost event flood behaviour reports
Camden, Penrith - Report on the 1867 Flood
CompletedPublication date: 01/01/1985This report presents an estimate 16,600 cubic metres per second for the peak flow rate in the Warragamba Gorge during the flood on or around the 22nd of June 1867. The method...