2 Flood Projects found

Tags: Wallaroi Creek Condobolin River Basin: 412 - Lachlan

Filter Results
  • Flood Project
    Flood study

    Ungarie Flood Study

    Completed
    Publication date: 03/05/2017
    The Ungarie Flood Study has been prepared for Bland Shire Council to define the existing flood behaviour in the township of Ungarie and establish the basis for subsequent...

  • Flood Project
    Flood study

    Lachlan River (Jemalong Gap to Condobolin) Rural Flood Study

    Completed
    Publication date: 01/10/2003
    The lower Lachlan Valley is one of New South Wales' major irrigation developments. The study area for the Lachlan River Floodplain Management Plan extends from Jemalong Gap in...